My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-11-2010
NewBrighton
>
Council
>
Packets
>
2010
>
CCP 08-11-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:39:19 PM
Creation date
8/6/2010 4:17:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 27, <br />Consent Agenda <br />1. Consolidated Vouchers 132154 through 132315 for a grand total of $ 479,757.78. <br />ReportNo. 10-173. <br />2. Purchasing card statement for month of June 2010, totaling $18,875.52. ReportNo. 10-174. <br />3. Consideration of Increase in Firefighter Relief Association Benefit Level. ReportNo.10-175. <br />Resolution No. 10-044. <br />4. Consideration of Reimbursement to Ryan Companies for 2002 AUAR Preparation. Report No, <br />10-176. <br />5. Consideration of Stormwater Management Facilities Maintenance Agreement for Project 10-1, <br />2010 Street Rehabilitation. Report No. 10-177. <br />Motion by Councilmember Phillips, seconded by Councilmember Samuelson to <br />approve the consent agenda as amended; noting item number 3 (Consideration oflncrease <br />in Firefighter ReliefAssociationBenefit Level.) include the recent retirees. <br />5 Ayes, 0 Nays -Motion Carried <br />Public Hearing <br />1. Public Improvement Hearing to Consider Project 10-15, 7th St-cet Sidewalk Between 23rd <br />Avenue NW and Inca lane. Report No. 10-178. Resolution No. 10-047. <br />Craig Schlichting, Civil Engineer lI gave a brief history on the project. A neighborhood meeting was held on <br />Thursday, July 1, 2010, most residents present at the meeting were not in favor of a sidewalk project. <br />However, most were in favor of the installation' of a new crosswalk at Inca Lane. Residents expressed <br />concern with the current crosswalk located at 23d Ave NW and 7" Street NW, as it causes congestion <br />with busses and vehicle traffic. At the July 13, 2010, council meeting the City Council accepted the <br />Feasibility Study for Project 10-15 and set the Public Improvement Hearing for July 27, 2010. Photos <br />were displayed indicated present conditions as well as proposed improvements. City staff conducted an <br />analysis, on three different school days counting the number of students crossing 7`h street. <br />Construction options were explained between the sidewalk construction, or the installation of a crosswalk at hica Lane <br />on 7'' St NW. The crosswalk option is substantially less expensive; with an estimated cost of $4,830.00, as compared to <br />the sidewalk estimate of $22,295.00, MSA funds would be used for the project. Staffrecommendation is to approve the <br />crosswalk option. <br />Councilmember Phillips questioned ifit would be beneficial to relocate the crosswalk located at 23'd Ave? Mr. <br />Schlichhng suggested the tendency may be to continue to cross at 23", as then: is a school entrance there. <br />Councilmember Burg questioned why a crosswalk was recommended over a sidewalk? Schlichtingreplied acrosswalk <br />seems to be good solution for a couple ofreasons, including the 20 mph school zone, along with the fact that pedestrians <br />are crossing a two lane mad. Councilmember Barman likes the crosswalk option, and noted it may encourage kids to <br />cross at hica lane instead ofcrossing at random points. <br />Councilmember Samuelson suggested proceeding with the crosswalk, with the option to review at a future date to ensure <br />safety. Councilmember Burg suggested reviewing the pedestrian traffic in the winter. <br />Director Wyffels suggested the School Resource Officer at Highview Middle School work with the students to educate <br />them on the crosswalk procedures. <br />10 Paget of <br />Consent Agenda <br />1. Consolidated <br />Vaxiners 132154 tlrtough <br />132315 for a grand total of <br />$ 479,757.78. Report No. <br />10.173. <br />2. Punding <br />cad 9atenent for nwnthof <br />June 2010,totaling <br />$18,875.52. Report No. 10- <br />174. <br />3. Consideration of <br />inaease m Furfl iter Relief <br />Association Benefit Le d. <br />Report No. 10-175. <br />4. Caeaderabon of <br />Reunbumerne t o Ryan <br />Cornparaes for 2002 <br />AUARPnuparation. <br />ReportNo. 10-176. <br />5. Comderation of <br />StcnrnvaterManagement <br />FaalNesMaintacance <br />Agreement forPnoject 10-1, <br />2010 Street Rdnabilitatim <br />Repot No. 10-177 <br />Public Hearing <br />I Public Hearing to <br />ansidataoject 10-15 <br />Report No. 10-178. <br />Resolution No. 10-047 <br />
The URL can be used to link to this page
Your browser does not support the video tag.