Laserfiche WebLink
EXPERIENCE McCombs Frank Roos Associates (MFRA) <br />(Continued) Civil and Water Resource Engineer <br />December 1998 to January 2009 <br />Adam T. Parker Resume <br />Page 2 <br />Plymouth, MN <br />Medicine Lake, MN—City Engineer. Responsible for day-to-day City Engineer duties and <br />reporting directly to City Council and Mayor involving engineering or public works related <br />matters. Projects included reviewing a proposed land purchase for cell tower construction <br />within a potential "Brownfield" (VIC) site requiring Phase I and Phase H ESA review, <br />Medicine Lake TMDL guidance, and providing a rehabilitation schedule for a segment of <br />sanitary sewer line. <br />Incoming Construction Plan Review Engineer far all MFRA Municipal Clients. (Communities <br />included Isanti, St. Paul Parr Spring Park, Mound, Cottonwood, and Medicine Lake, MN) <br />Verified plans adhered to city code and applicable regulatory industry standards (including <br />watershed and state agencies) regarding proper building and parking site location, roadway <br />design and alignment, trails and sidewalk accessibility, community connectivity, site grading, <br />utilities, erosion control, floodplain, wetland, and stormwater protection during construction <br />and post -construction. Provided comments sent directly to developer's engineer for review <br />and correction. Additional duties include creating and updating City Engineering Standards <br />sent to developers before plans were submitted for review and approval. <br />Banner Engineering—Plymouth, MN. Project Manager responsible for providing grading, <br />drainage, NPDES permitting, parking lot and roadway design, utility design, specifications <br />and construction management for a building expansion project. Proposed development was <br />able to overcome poor drainage conditions and provided proper wetland protection. The site <br />also incorporated low impact development techniques including filtration basins, sheet flow <br />spreaders via curb cuts and constructed wetlands. Duties also included obtaining the <br />engineering and construction contracts and management of the contracts including billing and <br />invoicing. <br />AUARIEAW/EIS (NEPA) Report Submittals. Drafted and submitted report responses, <br />calculations, and associated revisions for projects requiring an environmental assessment <br />including: water quality, land use and cover types, erosion and sedimentation, plan and land <br />use regulation compatibility, geologic hazards, soil types and wastes. Examples included: <br />• Mound Visions, Mound, MN <br />• Tamarack Hills PUD, Woodbury, MN <br />• Astra Village, Brooklyn Park, MN <br />Civil Site and Engineering Design—Additional Projects. Select examples include: <br />• College of St. Catherine Student Dormitory Expansion, St. Paul, MN <br />• Grand Casino Expansion and Highway Realignment, Hinckley, MN <br />• Tamarack Hills PUD, Woodbury, MN <br />• Boulder Lakes Business Park, Eagan, MN <br />Northern States Power Gas Utility, Engineering Intern St. Paul, MN <br />December 1997 to September 1998, May 1997 to August 1997 <br />• Developed new gas distribution system for the city of Fosston, MN. <br />• Designed, ordered materials, and assisted with installation of a new gas supply station for <br />the cities of Clearbrook and Tyler, MN. <br />• Updated and Implemented NSP Gas Standard drawings and procedures. <br />Upper Great Plains Transportation Institute, Research Assistant Fargo, ND <br />January 1997 to May 1997 <br />• Researched and Collected data for ND Heavy -Vehicle Monitoring Program. <br />• Entered necessary data into database for use in the GIS software. <br />