My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-22-2011
NewBrighton
>
Council
>
Packets
>
2011
>
CCP 02-22-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 8:00:43 PM
Creation date
2/18/2011 4:21:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G14 AX..1^ CP-D62 I* . <br /> Document G701T" - 2001 <br /> Change Order <br /> PROJECT(Name and address): CHANGE ORDER NUMBER:001 OWNER: <br /> 2010 Reroofing Water Treatment Plant DATE:December 8,2010 ARCHITECT: <br /> and Family Service Center <br /> New Brighton,MN CONTRACTOR: 1/ <br /> TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:211590-1&2 FIELD:❑ <br /> McPhillips Bros.Roofing Company CONTRACT DATE:May 14,2010 <br /> 2590 Centennial Drive CONTRACT FOR:General Construction OTHER:❑ <br /> St.Paul,MN 55109 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include,where applicable,any undisputed amount attributable to previously executed Construction Change Directives) <br /> Deduct labor and materials for small stud wall at the roof perimeters and wood blocking at the stack locations. <br /> The original Contract Sum was $ 658,000.00 <br /> The net change by previously authorized Change Orders $ 0.00 <br /> The Contract Sum prior to this Change Order was $ 658,000.00 <br /> The Contract Sum will be decreased by this Change Order in the amount of $ 2,800.00 <br /> The new Contract Sum including this Change Order will be $ 655,200.00 <br /> The Contract Time will be unchanged by Zero(0)days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is <br /> NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum <br /> Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon <br /> by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change <br /> Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. <br /> Inspec,Inc. McPhillips Bros.Roofing Company City of New Brighton <br /> ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name) <br /> 5801 Duluth Street 2590 Centennial Drive 803 Old Highway 8 NW <br /> Golden Valley,MN 55422 St.Paul,MN 55109 New Brig ton,7)55112 <br /> DRE ADDR ADDR <br /> JAI.* <br /> St attire B(Si na rvt- (Si nem e) <br /> John Donald Stephen Johnson -Ehtve-Ofs3h (9GWt '••+)± p <br /> (Typed name) (Typed name) name) <br /> (a ' / (d lz 'y -/O 12123/ID <br /> DATE I DATE DATE <br /> AIA Document G701 T.—2001.Copyright 01979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIA" <br /> Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAe Document,or any <br /> portion of it.may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document <br /> was produced by AIA software at 15:06:17 on 12/08/2010 under Order No 5654721409 1 which expires on 01/07/2011,and is not for resale. <br /> User Notes: (1917871225) <br />
The URL can be used to link to this page
Your browser does not support the video tag.