My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-22-2011
NewBrighton
>
Council
>
Packets
>
2011
>
CCP 02-22-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 8:00:43 PM
Creation date
2/18/2011 4:21:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KRAMER MECHANICAL <br /> PLUMBING & HEATING <br /> BID GOOD FOR 90 DAYS. <br /> Kramer Mechanical <br /> Plumbing & heating Inc. <br /> 7860 Fawn Lake Drive NE, Stacy MN 55079 <br /> Office(651)462-2194 <br /> Fax(651)462-1434 <br /> COMMERCIAL BID PLUMBING <br /> DATE: 2/8/2011 <br /> CONTRACTOR: CITY OF NEW BRIGHTON <br /> ATTENTION: BRAD <br /> JOB: WEST SIDE OF BUILDING <br /> QTY DESCRIPTION <br /> WEST SIDE OF BUILDING <br /> REPLACE EXISTING WATER HEATERS WITH 3 NATURAL GAS <br /> 199,000 BTU 95% RINNIA TANKLESS WATER HEATERS HANGING <br /> ON WEST OUTSIDE WALL. <br /> DRAIN SYSTEM DOWN AS NEEDED. <br /> DISPOSE OF 2 EXISTING WATER HEATERS. <br /> CAP OFF CHIMNEY AT BASE OF STACK. <br /> PVC CONCENTRIC VENTS OUT WALL. <br /> COPPER WATER PIPING TO UNITS. <br /> RE-INSULATE WATER LINES. <br /> RUN CONDENSATE LINES TO NEAREST FLOOR DRAIN. <br /> FILL SYSTEM CHECK FOR LEAKS <br /> GAS PIPE AND CHECK FOR LEAKS. <br /> TAKE CARE OF ELECTRICAL WORK <br /> LABOR <br /> PERMIT <br /> TAX INCLUDED <br /> WARRANTY ON THIS SYSTEM <br /> 10 YEA HEAT EXCHANGER <br /> 5 YEAR ALL PARTS <br /> LABOR ONE YEAR. <br /> TOTAL NOT TO EXCEED$9,500.00 <br /> WE CAN START ON REPLACEMENT WITH IN 4 DAYS AFTER SIGNED <br /> CONTRACT. <br /> COMPLETE INSTALL WITH IN 4 DAYS. <br /> TOTAL BID $ 9,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.