Laserfiche WebLink
Tower Options <br /> As indicated by Mike O'Rourke in previous meetings with the staff at the City, Clearwire feels that it <br /> acted in good faith to provide the city with a viable tower that it requested through the "Findings of <br /> Facts" for the SUP. Clearwire thought that it understood that the city intended the constructed tower to <br /> be used as a future revenue generating source by adding the requirement for future wireless carriers. <br /> Clearwire is willing to resolve this tower misunderstanding, but feels that the city is equally culpable in <br /> the misunderstanding and should participate in half of the cost of the resolution. The information for <br /> the possible solutions to the misunderstanding is outlined below. <br /> 1. Leave the existing tower in place but prepare the galvanized surface and paint the tower. (We <br /> are assuming possibly some shade of brown.)See sample photo of painted tower. Finish light <br /> installation and removal of old light tower. Cost for tower painting$9,500.00. <br /> 2. Erect a COW and transfer existing Clearwire services to the Cow and then replace the current <br /> tower with a new smaller 39 inch diameter Valmont tower on the same foundation.The new tower <br /> would hold Clearwire,The ball field lights, and city required future carriers and extension.When the <br /> tower is installed,transition Clearwire and the Lights back to the tower and remove the COW and the <br /> present light tower. Restore premises. Cost for new tower($40,100.00)and construction ($51,583.12) <br /> for a total cost of$91,683.12. <br /> 3. Erect a COW and transfer existing Clearwire services to the Cow and then replace the current <br /> tower with a new 30 inch diameter Valmont tower on the same foundation which would also hold CW <br /> and the ball field lights only. Following the new tower installation transition Clearwire and the Lights <br /> back to the tower and remove the COW and the present light tower. Restore premises. Cost for new <br /> tower($27,788.00) and construction ($51,583.12)for a total cost of$79,371.12. <br /> 4. Erect a COW and transfer existing Clearwire services to the Cow and then replace the current <br /> tower with a new 26.5 inch Valmont tower on the same foundation which would ONLY hold Clearwire. <br /> Following the new tower installation,transition Clearwire back to the tower and remove the COW, <br /> Leaving in Place the present light tower and lighting system. Restore premises. Cost for new tower <br /> ($22,866.00)and construction ($37,379.45)for a total cost of$60,245.45. <br />