Laserfiche WebLink
City of New Brighton Project 08-7 CONTRACTOR: SUNRAM CONSTRUCTION <br /> Silver Lake Road Bridge and Pedestrian Improvements 20010 75TH AVENUE NORTH <br /> S.P.147-591-03 BRIDGE(A) CORCORAN,MN 55340 <br /> FederalProject No. J PHONE:(763)420-2140 <br /> E) FAX:(763)494-3951 <br /> 4-PARTIAL PAYMENT 4 JUNUNE 8,2011 <br /> FUND:403-40841.6751 S.P.147-591-03 PAYMENT <br /> Total Payment <br /> Item No. Item Number Item Description Estimated Quantity Unit Unit Price Total Bid Amount Quantity this Payment Total Quantity to Date Amount <br /> 1 2021.501 MOBILIZATION 1 LS 56,000.00 $6,000.00 1 $ 6,000.00 <br /> 2 2104.501 REMOVE CURB AND GUTTER 195 LF $12 15 $2,369.25 195 $ 2,369.25 <br /> 3 2104.501 REMOVE CHAIN LINK FENCE 100 LF $7.35 $735.00 100 $ 735.00 <br /> 4 2104.501 REMOVE GUARD RAIL 75 LF $15.80 31,185.00 75 S 1,185.00 <br /> 5 2104.503 REMOVE CONCRETE SIDEWALK 950 SF $1.25 $1,187 50 950 $ 1,187 50 <br /> 8 2104.503 REMOVE CONCRETE ISLAND 80 SF $3.00 3240.00 60 $ 240.00 <br /> 7 2104.505 REMOVE BITUMINOUS PAVEMENT 340 SO YD $2.80 3952.00 340 $ 952.00 <br /> 8 2104.509 REMOVE CATCH BASIN GRATE CASTING 1 EA $550.00 $550.00 I $ 550.00 <br /> 9 2104.513 SAWING BITUMINOUS PAVEMENT 200 LF $3.00 5600.00 219 $ 857.00 <br /> 10 2104.523 SALVAGE SIGN TYPE C 3 • EA $53.00 $159.00 2 $ 106.00 <br /> 11 2105.501 COMMON EXCAVATION 100 CY $23.75 32,375.00 227 $ 5,391.25 <br /> 12 2105.522 SELECT GRANULAR BORROW(LV) 85 CY $24.65 $2,095.25 0 S <br /> 13 2211.501 AGGREGATE BASE CLASS 5 80 TON $28.20 31.572.00 79 $ 2,069,80 <br /> 14 ' 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 15 GAL $3.15 547.25 0 $ - <br /> 15 2360.503 TYPE SP 12.5 WEARING COURSE MIXTURE(4,Ej 3.0"THICK 300 'SY $19.70 35.910.00 325.2 $ 6,406.44 <br /> 16 2360.503 TYPE SP 12.5 WEARING COURSE MIXTURE(4,E)4.0"THICK 50 SY 347.25 $2,362 50 187.55 S 8,861 70 <br /> 17 2401.541 REINFORCEMENT BARS(EPDXY COATED) 470 LB $10.20 $4,794.00 470 $ 4,794.00 <br /> 18 2401.603 RAISED CURB CONCRETE(3Y48) 200 LF $57.00 $11.400.00 198 $ 11,172.00 <br /> 19 2401.818 SPECIAL SURFACE FINISH 550 SF $3.70 $2,035.00 550 $ 2.035.00 <br /> 20 2401.618 SPECIAL SURFACE TREATMENT(INPLACE) 1240 SF $4.75 35,890.00 1,116 $ 5,301.00 <br /> 21 2402.583 ORNAMENTAL METAL RAILING TYPE 1 199 LF $14220 328,297.80 199 S 28,297.80 <br /> 22 2402.583 ORNAMENTAL METAL RAILING TYPE 2 199 IF $109.75 321,840.25 199 $ 21,840 25 <br /> 23 2433.506 REMOVE 8'-0"WIRE FENCE TYPE S-2 196 LF $7.35 $1,440.80 196 $ 1.440 60 <br /> 24 2433.506 REMOVE 3'-0"WIRE FENCE TYPE S-3 196 LF $7.35 $1,440.80 196 $ 1,440.60 <br /> 25 2433.516 ANCHORAGES TYPE REINF BARS 208 EA $17.30 33,598.40 204 $ 3.529.20 <br /> 26 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48.4020 1 EA $1,650.00 31,850.00 1 $ 1,650 00 <br /> 27 2506.516 CASTING ASSEMBLY 1 EA $350.00 3350.00 2 $ 700.00 <br /> 28 2521.501 4"CONCRETE WALK 1850 -SF $3.10 $5 735.00 2131.55 5 6,607 81 <br /> 29 2531.501 CONCRETE CURB 8 GUTTER DESIGN B624 205 LF $25.00 $5,125,00 233 $ 5,825 00 <br /> 30 2531.802 PEDESTRIAN CURB RAMP 5 EA $603.00 33,000.00 5 S 3,000.00 <br /> 31 2531.602 CONCRETE MEDIAN NOSE DESIGN 7109 1 EA $395.00 3395.00 - 1 $ 395.00 <br /> 32 2531.818 TRUNCATED DOMES $0 SF $34.00 52,720.00 48 S 1.632.00 <br /> 33 2531.818 CONCRETE ISLAND 360 SF $4,60 $1,656.00 301.5 $ 1.388.90 <br /> 34 2554.501 TRAFFIC BARRIER DESIGN SPECIAL 25 IF 5120.00 53,000.00 25 $ 3,000.00 <br /> 35 2554.523 END TREATMENT-TANGENT TERMINAL 1 EA $3,000.00 33,000.00 1 $ 3,000.00 <br /> 36 2557.501 WIRE FENCE DESIGN 96V-9322 100 LF $71.40 $7,140.00 100 $ 7,140 00 <br /> 37 2563.601 TRAFFIC CONTROL 1 LS 36,800.00 $6,800.00 1 $ 6,80000 <br /> 38 2564.537 INSTALL SIGN TYPE C 3 EA $210 00 3630.00 2 $ 420.00 <br /> 39 2565.602 RELOCATE PEDESTRIAN PUSH BUTTON 1 EA 36,000.00 $6,000.00 0 $ - <br /> 40 2575.604 SEEDING 50 SY 3210 3105.00 595 $ 1,249.50 <br /> 41 2582 502 4"SOLID LINE WHITE-EPDXY 160 LF $7.35 31,176.00 227 S 1,688.45 <br /> 42 2582.503 CROSSWALK MARKING-POLY PREFORM 72 SF $18.40 $1,324 80 72 $ 1,324.80 <br /> TOTAL CONSTRUCTION COST $158,883.20i Work to date $182,380.85 <br /> CHANGE ORDER <br /> 2 2104.509 REMOVE GUARD RAIL POST 1 EA 5300.00 5300.00 1 $ 300.00 <br /> 2 2545.801 RELOCATE UTILITY(HANOHOLE) I _ IS $715.02, $715.02 1 $ 715 02 <br /> 2 2565.602 MOB LOOP DETECTOR 1 EA 51,200.00 $1,200.00 I $ 1.200.00 <br /> 2 2563.610 TRAFFIC CONTROL(FLAGMAN) 3 HR $80.00 $180.00 3 $ 180 00 <br /> TOTAL OF ADDED ITEMS $2,395.02 $2,395.02 <br />