My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-24-2012
NewBrighton
>
Council
>
Packets
>
2012
>
CCP 01-24-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 6:50:31 PM
Creation date
1/20/2012 11:42:34 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> city of <br /> NEW <br /> BRIGHT ON <br /> d re cit) drat 11 ar ks iur u« <br /> interoffice <br /> MEMORANDUM _ <br /> to: Janice Gundlach, City Planner <br /> from: Craig Schlichting, Civil Engineer II <br /> subject: Bell Pole <br /> date: January 13, 2012 <br /> The Engineering Department has reviewed the site plan for the proposed building addition <br /> and onsite parking amendments at Bell Pole and we offer the following comments; <br /> Streets-Parking Lot <br /> 1. Rice Creek Watershed District has reviewed the plan, and based on the limited <br /> change to the existing drainage patterns and hard surface areas they have waived <br /> further review and permitting requirements (see letter from Kate MacDonald at <br /> Houston Engineering). <br /> 2. It is not currently clear how the drainage patterns will be affected with the addition of <br /> curb and gutter. Staff has contacted the architect to request existing survey <br /> information. Prior to parking lot construction, the architect has agreed to provide <br /> additional survey information. Staff will work with the architect to insure that the final <br /> spot elevations of the curb will be designed to discharge storm water to match <br /> existing conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.