Laserfiche WebLink
resourceful. naturally. BARR <br /> engineering and environmental consultants <br /> February 3, 2012 <br /> Grant Wyffels <br /> Public Works Director <br /> City of New Brighton <br /> City Hall <br /> 803 Old Highway 8 NW <br /> New Brighton,MN 55112 <br /> Re: Water Treatment Plant#1 Iron Vessel Platform Modifications, City Project No. 12-06 <br /> Dear Mr.Wyffels: <br /> Bid were received on January 31,2012 for the above-referenced project at Water Treatment Plant#1. <br /> Four firms were invited to bid on this project. Two proposals were received as tabulated below: <br /> CNC Metalcraft,LLC-$73,445 <br /> Metro Manufacturing,Inc. -$99,969 <br /> We have reviewed the proposals and recommend that the project be awarded to the apparent low bidder, <br /> CNC Metalcraft,LLC.CNC Metalcraft,formally Alums Fabricators,has performed previous work for <br /> the City of New Brighton and the City staff has found their work to be of good quality. A copy of CNC <br /> Metalcraft's bid is attached,as well as a summary of the engineer's estimate and the bids received. <br /> Please let me know if you have questions about this project. <br /> Thanks, <br /> Julia Macejkovic,P.E. <br /> Enclosure <br /> Barr Engineering Co. 4700 West 77th Street, Suite 200,Minneapolis,MN 55435 952.832.2600 www.barr.com <br />