My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Book # 73 11-28-95, 2-27-96, 95-214-96-054
NewBrighton
>
Council
>
Packets
>
1997 - 1999 AGENDA REPORTS
>
Book # 73 11-28-95, 2-27-96, 95-214-96-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 11:43:58 AM
Creation date
5/2/2012 9:29:07 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Integration of Related Systems <br /> 3. What complementary constructed circulation elements would be desirable <br /> and how should they he accommodate <br /> • Pedestrian paths (where) <br /> • Bicycle trails <br /> - On-road, off-road, other <br /> - One side (which) or both sides <br /> - Continuous along entire corridor or only in certain segments <br /> • Crossings for pedestrians/bicydists (such as special designated at- <br /> grade crossings, underpasses, overpasses) <br /> 2. What natural systems need to be accommodated? <br /> • Drainage crossings, ponds, water quality <br /> • Wildlife crossings <br /> • Water quality <br /> Site Specific Forces/Issues <br /> Following is a summary of site- or area-specific forces/issues for the TH 96 <br /> corridor. The summary provides a comprehensive look at how the forces/issues <br /> impact the whole corridor as well as each individual city in the corridor. Where <br /> forces/issues apply to more than one city, descriptions are included under all <br /> impacted cities. <br /> New Brighton <br /> 1. Undeveloped Land. Land use/development and access needs to the <br /> remaining undeveloped parcels west of the I-35W interchange. <br /> 2. Entrance Monument. An entrance monument for New Brighton is being <br /> considered at the west end of TH 96. <br /> • Should this monument be a unique feature for New Brighton? <br /> • Should a coordinated system of monumentation be developed for all cities <br /> in the TH 96 corridor? <br /> 3. I-35W Intersection. A number of issues need to be coordinated with <br /> Mn\DOT including: <br /> • Intersection capacity <br /> • Bridge widening <br /> • Change in geometries <br /> ▪ Need for/accommodation of pedestrian/bicycle paths on the bridge <br /> (none, one side, or both sides) <br /> •ZS7Y 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.