Laserfiche WebLink
July 24, 2012 Page 9ofII <br />would provide a great deal of information to the City on how traffic should properly flow in thisarea He <br />suggested that Condition #5 read: Busses entering and exiting the subject property must make only right hand <br />tuns from 401" Street SW onto Old Highway 8 and a right hand tum from the South. <br />Mayor Jacobsen asked ifthere were any other comments from the public. There were no additional <br />comments at this time. <br />City Attorney LeFevere stated it would be appropriate to amend the current motion on the floor amending <br />Paragraph 10 and adding Condition #5. <br />MOTION AMENDMENT: <br />Motion by Councilmember Jacobsen seconded by Councilmember Bauman to amend Paragraph 10 <br />to read: The City Council finds that there is sufficient evidence in the record to conclude that the <br />special use permit criteria of Section 8-130 are met if the conditions listed below are satisfied; and add <br />Condition #5 stating: Busses entering and exiting the subject property must make only right hand <br />turns from 400 Street SW onto Old Highway 8 and a right hand turn from the South. <br />AMENDMENT VOTE: <br />5 Ayes, 0 Nays -Motion Carried <br />Motion by Councilmember Bauman seconded by Councilmember Jacobsen to adopt the Resolution <br />approving the Special Use Permit and Nonconforming Use Permit for 4010 Street SW allowing for <br />the operation of a school bus terminal with the amended criteria as stated . <br />5 Ayes, 0 Nays -Motion Carried <br />3. Consideration of Resolution Accepting Bids and Awarding a Contract for Project 12-3 , <br />2012 Pavement Management Program and Project 12-8, New Brighton Exchange City <br />Improvements. Report No. 12-186. Resolution No. 12-059. <br />Public Works Director Wyffels provided Council with further information on City Project 12-3 the 2012 <br />Pavement Management Program along with Project 12-8 the New Brighton Exchange. City <br />Project 12-3 included the replacement of the City Hall parking lot, Veterans Park trail and <br />Golden Pond would be dredged. Also, the Meadow Wood Park hard court would be replaced, <br />the Driftwood Park parking lot would be reconstructed, the Hansen Park parking lot would be <br />reconstructed and the Well 48 paved area would be redone. City Project 12-8 included the <br />final lift of bituminous paving on Northwest Parkway in front of the property, the final lift of <br />bituminous paving on Central Park Boulevard and 8' of bituminous trail located on Outlet A. <br />He noted bids were received for both projects with the lowest responsible bidder being <br />Peterson Companies, Inc. with a bid of $412,866. He discussed the historical prices of paving <br />projects noting the bidding climate was higher at this time. Peterson Companies has done <br />work for the City in the past and is qualified and capable of performing work of this kind. If <br />awarded, the contract requires project completion by November 2, 2012. <br />Councilmember Bauman asked if the City had a replacement cycle for the City's parking lots. <br />Public Works Director Wyffels indicated the City had a 30 -year schedule for all City parking lots and a 20 - <br />year replacement schedule for City trails. <br />Councilmember Bauman requested further infomiation on the mobilization fee. Public Works Director <br />Wyffels discussed this matter in further detail. <br />Councilmember Jacobsen asked how often Golden Pond would be dredged. Public Works Director Wyffels <br />stated the City has programmed $80,000 for dredging on an annual basis. These monies could be used for <br />large or small projects depending on the City's needs. He explained that the City has moved away from <br />sanding to salt in the winter months with the hopes of reducing the need for future pond dredging. <br />Councilmember Samuelson asked why there was such a large difference between the contractor's bid and the <br />engineer's estimate. Public Works Director Wyffels reviewed the line items in detail explaining several <br />3. Consideetion of <br />Rc otution Accepting Bids <br />and Awarding a Contract <br />for Project 12-3,2012 <br />Pavement Management <br />Program and Project I2A <br />New Brighton Exdmge <br />City hTVroveme u <br />RepatNo. 12.186, <br />Resolution No. 12-059. <br />