My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-28-2012
NewBrighton
>
Council
>
Packets
>
2012
>
CCP 08-28-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 12:54:16 AM
Creation date
8/24/2012 2:58:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF NEW BRIGHTON CONTRACTOR: SIERRA EXTERIORS <br /> ENGINEERING DEPARTMENT 2095 LONGVIEW DRIVE <br /> NEW BRIGHTON, MN 55112 <br /> Project 12-8, NBE Concrete Sidewalk and Limestone Pylons <br /> FINAL PAYMENT <br /> Date: AUGUST 17, 2012 <br /> NO. DESCRIPTION UNIT QUANTITY UNIT TOTAL <br /> PRICE COST <br /> 1 6"Aggregate Base CL VII C.Y. 30 $7.50 I $225.00 <br /> 2 4" Concrete Walk S.F. 1,580 $4.951 $7,821.00 <br /> 3 Limestone Pylon EACH 6 $2.380.00 $14.280.00 <br /> TOTAL CONSTRUCTION COST $22,326.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.