My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-12
NewBrighton
>
Council
>
Packets
>
2012
>
2012 Council Work Session Materials
>
08-22-2012
>
08-22-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 8:28:42 PM
Creation date
11/6/2012 1:19:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
long-term financing plan for capital asset replacement is directly connected to the general <br /> fund. <br /> Tax Levy and 2013 Budget <br /> The draft 2013 budget would require a levy increase of 1.39% or $7,388,200. This budget <br /> plans for a community wide survey, the hiring of a park maintenance person and <br /> adjustments for anticipated inflationary increases in various costs including utilities such <br /> as gas and electric. The anticipated impact on a median valued home in New Brighton <br /> would be an increase of$5 to their City taxes. <br /> The last community wide survey was completed in 2006. Some communities choose to <br /> have a statistically valid survey conducted once a year or once every other year. Having a <br /> survey conducted would help augment the next Council teambuilding retreat with regards <br /> to developing a three to five year vision of the City along with measureable goals and <br /> outcomes. <br /> New Brighton's parks have a need to for an additional park maintenance employee. The <br /> department has .3 staff per 1,000 residents. The ICMA's Performance Measurement <br /> Center shows that cities similar in size to New Brighton staff at a level of.7 employees <br /> per 1,000. This position is included in the current 2013 draft budget. <br /> Compensation <br /> The proposed 2013 budget includes a 2% COLA and step increases for non-union and <br /> union personnel. The City of New Brighton currently has collective bargaining <br /> agreements in place with our three union groups (sergeants, police, and maintenance <br /> workers) for 2% COLA and step increases in 2013. The total proposed personnel budget <br /> for all funds and operations in 2013 is $9,295,000 and for the general fund is $7,789,400. <br /> This is a projected increase of$392,300 (includes all personnel costs for elected officials, <br /> full-time, part-time, and seasonal employees for all funds and operations) over the 2012 <br /> adopted budget and an increase of$341,000 for the general fund. <br /> The following is a chart identifying the projected cost difference between the 2012 <br /> adopted and 2013 proposed personnel budgets. <br /> Cost Comparison of the 2012 Adopted Budget and 2013 City Manager Proposed Budget <br /> for Union and Non-Union Personnel (Includes Compensation, Insurance Contributions, <br /> FICA, PERA, Workers Compensation, and Other Misc. Personnel Expenditures). <br /> Description 2012 Adopted Budget- 2013 Proposed City Difference Between <br /> General Fund Includes Manager Budget- the 2012 Adopted <br /> a 2% COLA, Step General Fund Budget and 2013 <br /> Increase, and Health Includes a 2% City Manager <br /> Insurance COLA, Step Proposed Budget <br /> H\Budget and TNT Presentations\Budget 2013\2013 Budget Draft August 22.2012.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.