CITY OF NEW BRIGHTON ENGINEERING DEPARTMENT
<br /> QUOTE TABULATION
<br /> CITY PROJECT 13-5,RICE CREEK TERRACE STORM SEWER REPAIR
<br /> PROJECT COSTS BASED ON ESTIMATED PLAN QUANTITIES FEBRUARY 6,2013
<br /> 2678-2712 RICE CREEK TERRACE
<br /> QUOTE TABULATION 1 2 3 4
<br /> PENN DAVE PERKINS C.W.HOULE HYRDOCON
<br /> NO. ITEM QUANTITY UNIT UNIT PRICE CONTRACTING UNIT PRICE CONTRACTING UNIT PRICE INC. UNIT PRICE INC.
<br /> INC. INC.
<br /> 1 MOBILIZATION 1 LUMP SUM $3.000.00' $3,000 $1,200.00 $1,200 $1,230.00 $1,230 $4,500.00 $4,500
<br /> 2 REMOVE SEWER PIPE STORM 5 L.F. $10.00 $50 $50.00 $250 $41.00 $205 $50.00 $250
<br /> 3 CONNECT TO EXISTING STORM 1 EACH $2,000.00 $2,000 $1,200.00 $1,200 $2,360.00 $2,360 $500.00 $500
<br /> 4 15"CMP STORM SEWER 26 L.F. $116.00 $3,016 $100.00 $2,600 $89.00 $2,314 $150.00 $3,900
<br /> 5 15"CMP STORM SEWER BENDS 2 EACH $350.00 $700 $350.00 $700 $245.00 $490 $500.00 $1,000
<br /> 6 15"CMP APRON 1 EACH $200.00 $200 $650.00 $650 $680.00 $680 $500.00 $500
<br /> 7 DUCKBILL PIPE ANCHORS 6 EACH $210.00 $1,260 $250.00 $1,500 $630.00 $3,780 $150.00 $900
<br /> 8 ADJUST RIPRAP OUTFALL 1 LUMP SUM $1,000.00 $1,000 $1,500.00 $1,500 $2,140.00 $2,140 $2,500.00 $2,500
<br /> 9 RANDOM RIPRAP CLASS III 10 CU YD $80.00 $800 $250.00 $2,500 $147.00 $1,470 $100.00 $1,000
<br /> 10 FLOATING SILT CURTAIN 50 L.F. $8.00 $400 $35.00 $1,750 $17.00 $850 $25.00 $1,250
<br /> 11 TURF ESTABLISHMENT 30 SQ YD $6.00 $180 $25.00 $750 $16.00 $480 $15.00 $450
<br /> TOTAL _ $12,606 $14,600 $15,999 $16,750
<br /> ALTERNATE QUOTE TABULATION
<br /> 1 2 3 4
<br /> DAVE PERKINS DAVE PERKINS C.W.HOULE HYRDOCON
<br /> NO. ITEM QUANTITY UNIT _ UNIT PRICE CONTRACTING UNIT PRICE CONTRACTING UNIT PRICE INC. UNIT PRICE INC.
<br /> INC. INC.
<br /> 1 REMOVE EXISTING TREES 1 LUMP SUM $200.00 $200 $650.00 $650 $870.00 $870 $350.00 $350
<br /> 2 DECIDIOUS TREES 4 TREES $250.00 $1,000 $750.00 $3,000 $485.00 $1,940 $350.00 $1,400
<br /> 3 RED TWIG DOGWOOD LIVE CUTTINGS 45 CUTTINGS $12.00 $540 $10.00 $450 $85.00 $3,825 $20.00 $900
<br /> 4 EXTEND 6"ROOF DRAIN W/FLEXIBLE HDPE 50 L.F. $10.00 $500 $25.00 $1,250 $23.00 $1,150 $12.00 $600
<br /> TOTAL _ $2,240 $5,350 $7,785 33,250
<br /> PROJECT TOTAL I 314,846 $19,950 $23,784 $20,000
<br />
|