My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-14-2013
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 2013
>
05-14-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2014 11:28:30 AM
Creation date
6/4/2013 4:18:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 14, 2013 <br />Page 3 of 5 <br />5 Ayes, 0 Nays - Motion Carried <br />Grp (LErG) for Elec. <br />Citation Intafaoa Sys. <br />Public Hearing <br />Repoxt No. 13 -109. <br />k Public Hearine <br />None. <br />Council Business <br />1. Consideration of awarding bid for City Project 13 -2C Mill and Overlay. Report <br />Council Business <br />No. 13 -110. Resolution No. 13-036. <br />1. Consideration of <br />awarding bid for City <br />Project 13 -2C Mill and <br />City Manager Lotter reported Public Works Director Wyffels would be making a presentation for this City <br />Overlay. <br />Project <br />Repat No. 13 -110. <br />Public Works Director Wyffels stated Staff is recommending the Council authorize the repair and <br />Resolution No. 13 -036 <br />replacement of the surfacing on the streets located on Schedule A and B. The surfacing of these streets was <br />failing due to pavement stripping and Staff is recommending the roads be repaired before the entire pavement <br />surface is lost" He indicated the project has been divided into two bidding schedule areas to give Council an <br />option on funding a small project (1.4 miles) or a larger project (3.8 miles). He noted the skate park at <br />Freedom Park was included in this project. As directed by Council, staffhas worked with the Finance <br />Director and City Manager to identify funding sources available to pay for either project. A tentative timeline <br />was reviewed with the Council noting the project would take six weeks. Public Works Director Wyffels <br />explained the City received nine bids for the project and the low bidder was North Valley, Inc. This company <br />had done work for the City in the past and is qualified and capable of perfomling work of this kind and <br />magnitude. Staff recommended the Council accept the bids and award the contract to North Valley, Inc. <br />Mayor Jacobsen questioned if the overlay project would be similar to those conducted in the past Public <br />Works Director Wyffels stated this was the case it would be a high quality mix placed on top of the street and <br />would extend the life of the road another 10 years. <br />Councilmember Burg asked why the seal coating would take place in August. Public Works Director <br />Wyffels indicated seal coating took place in the summer months due to the daytime and evening temperatures <br />and the roadways were clear of leaves. <br />Councilmember Burg requested further information on the term "super pave." Public Works Director <br />Wyffels provided a definition to the Council. <br />Councilmember Jacobsen questioned when the City would address the other roads in poor condition. Public <br />Works Director Wyffels anticipated there would be another mill and overlay project in 2014 in the Apache <br />Hills area He then discussed how the 2013 project would be financed and noted State Aid funds would be <br />used for the project. <br />Councilmember Bauman thanked Staff for providing the Council with the increased scale on the project and <br />commented it was conducive to complete the recommended roadways as they were concentrated in the same <br />neighborhood Public Works Director Wyffels stated the City was trying to be proactive in managing the <br />street conditions. <br />Mayor Jacobsen thanked the Public Works Staff for their long term planning. <br />Councilmember Jacobsen asked when the 311 app would be ready for use by residents. City Manager Lotter <br />explained the app would be available at the end of the month. <br />Motion by Councilmember Jacobsen, seconded by Councilmember Burg to accept the bids and <br />adopt a Resolution awarding a contract for City Project 13 -2C, Mill and Overlay to the <br />lowest responsible bidder, North Valley, Inc., in the amount of $429,046.78. <br />5 Ayes, 0 Nays -Motion Carried <br />2. Consideration of <br />2. Consideration of revisions to Chapter Two (Information Technology) of the Employee <br />regions to Chapter Two <br />(information Technology) <br />
The URL can be used to link to this page
Your browser does not support the video tag.