My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 07-09-2013
NewBrighton
>
Council
>
Packets
>
2013
>
2013 Council Work Session Materials
>
WS 07-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 4:33:45 PM
Creation date
7/5/2013 1:49:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
How does it self-fund? <br /> Performance Contracting uses energy, operational savings and avoided capital <br /> expenditures to fund repayment of capital for building/infrastructure needs. <br /> Budget Neutral Approach <br /> 1,1 Energy Annual <br /> Capital Avoidance Savings* Capital <br /> Current Operational Repayment** <br /> • <br /> Operational <br /> Costs New I: Operational <br /> Costs after <br /> Operational Capital <br /> Costs Repayment <br /> *Excess savings are retained by the client. Shortfall in energy savings made up by Johnson Controls. <br /> ** Performance Guarantee ensures that savings will at least be sufficient to repay capital for term. <br /> 8 Johnson Controls, Inc., Confidential& Proprietary Johnson 4 <br /> Controls <br />
The URL can be used to link to this page
Your browser does not support the video tag.