Laserfiche WebLink
B. There shall be a minimum setback of the height of the building, or sixty feet, whichever <br /> is greater, from any property zoned R-1 or R-2. Subject to approval of the City Council, <br /> the setbacks referenced in this sub-section may be decreased for any new Planned Unit <br /> Development that is located in the area known as the Northwest Quadrant project area, as <br /> defined by the Northwest Quadrant Framework Plan approved by the City Council on <br /> June 28, 2005. <br /> Adjacent Long Lake Regional Park is zoned R-1. It is not possible to meet a 60' setback <br /> to this boundary. Because Enclave at New Brighton Exchange is part of the Northwest <br /> Quadrant project area, this standard will be decreased to 25' as part of the PUD <br /> approval. <br /> C. There shall be a minimum setback of the height of the building, or sixty feet, whichever <br /> is greater, from any public street. Subject to approval of the City Council, the setbacks <br /> referenced in this sub-section may be decreased for any new Planned Unit Development <br /> that is located in the area known as the Northwest Quadrant project area, as defined by <br /> the Northwest Quadrant Framework Plan approved by the City Council on June 28, 2005. <br /> It is not possible to meet a 60' setback to adjacent public streets and this standard runs <br /> contrary to many of the design goals envisioned for New Brighton Exchange. Because <br /> Enclave at New Brighton Exchange is part of the Northwest Quadrant project area, this <br /> standard will be decreased to 10'as part of the PUD approval. <br /> (9) Any improvement, such as streets, sidewalks, or utilities to be located on or in land dedicated <br /> to the public, shall be ordered and financed in accordance with Sections 25-16 through 25-45 of <br /> the City Code. <br /> This standard is met. All proposed streets will be public and dedicated as so on the plat. Public <br /> Works has been working closely with the applicant to ensure all right-of-way and utility needs <br /> will be met with the proposed street sections. <br /> PUD Approval Criteria <br /> Section 7-240 outlines criteria for the Planning Commission and City Council to consider when <br /> reviewing a Planned Unit Development. The Planning Commission, when making a <br /> recommendation to the City Council, shall consider the following factors. <br /> (1) The consistency of the proposed development with the adopted or proposed comprehensive <br /> plan for the City. <br /> The Comprehensive Plan identifies this area as City Center. The City Center designation calls <br /> for high intensity use, creation of a sense of place, traditional neighborhood design principals <br /> such as on-street parking and sidewalks, and incorporation of the design guidelines originally <br /> envisioned for the Northwest Quadrant Redevelopment Area. Staff finds the proposed PUD is <br /> consistent with the City Center designation based upon the "urban village" design of the site <br /> plan, which includes narrower streets, smaller lots, sidewalks, on-street parking, pedestrian <br /> nodes and linkages, landscaped medians, and architectural style variety and interest in the <br /> homes, including front porches. <br /> (2) The extent to which the proposed development is designed to form a desirable and unified <br /> environment within its own boundaries in terms of relationship of structures, patterns of <br /> circulation, visual character, and sufficiency of drainage and utilities. <br />