Laserfiche WebLink
2013 New Brighton Exchange Work Plan <br /> Project/Activity Description Status Revised <br /> o NBE Video Staff and CTV have been working on a marketing video for 1-7-2013 <br /> promotion of New Brighton Exchange. CTV staff is now in the <br /> editing process. <br /> o NBE E-Newsletter Working on Winter 2013 edition. 1-7-2013 <br /> o Signage Need to address interim marketing signage and long-term 12-11-2012 <br /> solution on permanent monument type signage identifying the <br /> development. <br /> Environmental <br /> o MPCA City is working with agency on several issues with the MPCA: 8-20-2012 <br /> issues: <br /> • Institutional controls and feedback on environmental covenants. <br /> • Vapor controls and additional dump venting. <br /> • Review/approval of RAP implementation reports. <br /> o NW Refinery Delisting City monitoring MPCA de-listing process. Anticipate that the agency 10-12-2012 <br /> will de-list in spring 2013. <br /> o Tract 2 Final Clean-Up Portions of Tract 2 still require some environmental and geo-technical 9-26-2012 <br /> corrections. These include the area between NW Refinery and <br /> portions of the former Butchers Spur and Ferrellgas City needs to <br /> negotiate final clean-up plan with Pulte and MPCA. <br /> Title & Platting <br /> o East side registration The City has been working on a title registration for the entire east 9-26-2012 <br /> side parcels. The process will convert all of the titles from abstract <br /> to Torrens and eliminate any gaps and overlaps in legal descriptions. <br /> I:\New Brighton Exchange\Work Plan\NBE Work Plan.doc(2013).doc <br />