My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC Packet 11-19-2013
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
PC Packets
>
2013
>
PC Packet 11-19-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 7:15:50 AM
Creation date
11/15/2013 10:32:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE <br /> Exhibit A: <br /> FOR Verizon Wireless AWS MODIFICATION PROJECT <br /> Presented to: <br /> CITY OF NEW BRIGHTON PLANNING DEPARTMENT <br /> EXISTING LOCATION: <br /> Water Tower at 700 Silver Lake Road <br /> New Brighton MN 55112 <br /> (VERIZON SITE ID: MIN NEW BRIGHTON) <br /> Verizon Wireless proposes to remove and replace (2) of(8) existing panel antennas <br /> positioned at the one the Water Tower. Additionally, Verizon proposes to install: (2) new <br /> panel antennas, (3) new Remote Radio Units, add (1) Main Distribution Box, (2) Sector <br /> Boxes, (2) new Hybrid cable lines, (1) underground conduit from the Equipment Shelter <br /> to the Water Tower, and (1) new penetration at the Catwalk. All new antennas and <br /> ancillary equipment will be positioned at the existing elevation(s) and shall be painted to <br /> match the existing Water Tower. (See attached Site Plans dated 8-7-13 (Rev C)). <br /> • <br /> Lynda DePoe Site Acquisition Specialist I FMHC Corporation 17400 Metro Blvd I Suite 260 1 Edina,MN I Mobile(206)351-4019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.