Laserfiche WebLink
<br />, <br /> <br />.1 <br /> <br />~. <br /> <br />RIGHT-OF-W AY ORDINANCE FEE STRUCTURE <br /> <br />Registration Fee <br /> <br />Excavation Permit Fee <br /> <br />Obstruction Permit Fee <br /> <br />Permit Extension <br /> <br />Delay Penalty <br /> <br />1:\ENGINEER\ENG\FORMS\UTl Y-PRM\Fee _ Structure.wpd <br /> <br />$25 <br />$125 <br /> <br />$50 (not required with excavation permit) <br /> <br />$25 <br /> <br />$10 per day plus $25 permit extension fee <br /> <br />October 22, 1999 <br />