Laserfiche WebLink
Page 2 of 2 <br />Project Budget Amendment for City Project 13 -9, Lift Station SCADA and Communications Upgrades. <br />March 25, 2014 <br />radio to be viewed on the existing SCADA computer. The Utility Power Meter can be relocated to the <br />back of the new Lift Station Control panel. The Utility Main Disconnect, Transfer Switch, and Backup <br />Generator Receptacle will be incorporated in the new Lift Station Control panel. <br />Costs and Funding: The $174,400 cost for the project will be paid from the Sanitary Sewer Capital <br />Fund. This tot 1 project cost which includes this proposed amendment was included in the 2014 Utility <br />Rate A alys`s. <br />Grant M. V. yffels E. <br />Director of Public Works <br />Attachments: <br />Exhibits 1 -2 (Existing Conditions) <br />Exhibits 3 -5 (Proposed Stainless Steel Panel) <br />