My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-25-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 03-25-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 12:53:45 PM
Creation date
3/31/2014 8:15:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />Project Budget Amendment for City Project 13 -9, Lift Station SCADA and Communications Upgrades. <br />March 25, 2014 <br />radio to be viewed on the existing SCADA computer. The Utility Power Meter can be relocated to the <br />back of the new Lift Station Control panel. The Utility Main Disconnect, Transfer Switch, and Backup <br />Generator Receptacle will be incorporated in the new Lift Station Control panel. <br />Costs and Funding: The $174,400 cost for the project will be paid from the Sanitary Sewer Capital <br />Fund. This tot 1 project cost which includes this proposed amendment was included in the 2014 Utility <br />Rate A alys`s. <br />Grant M. V. yffels E. <br />Director of Public Works <br />Attachments: <br />Exhibits 1 -2 (Existing Conditions) <br />Exhibits 3 -5 (Proposed Stainless Steel Panel) <br />
The URL can be used to link to this page
Your browser does not support the video tag.