My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-13-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 08-13-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 12:12:29 PM
Creation date
8/8/2014 4:11:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved <br />Commissioner McPherson asked if the concrete panels would be painted. Mr. Murlowski had not planned to paint the <br />panels, noting they would not be visible from the adjacent neighborhood. He noted he would not be able to plant trees <br />under the power lines. <br />Commissioner Deick inquired if the applicant were to plant trees on the berm if this would improve the decibel level <br />being transmitted from the property. Andrew Skoglund, Barr Engineering, commented that trees on top of the berm <br />would not improve the sound mitigation, but would visually improve the aesthetics of the berm. Planner Gundlach <br />commented the Planning Commission could require the applicant to provide landscaping on the berm. <br />Commissioner Danger respectfully disagreed with Mr. Skoglund's comment as he believed that vegetation of any kind <br />would assist in refracting decibel levels. <br />Commissioner Danger asked if a new deadline should be set within the Special Use Permit. Planner Gundlach indicated <br />the Commission could consider moving the completion date to August 31st or September 15th. Mr. Murlowski believed <br />that September 30th would be reasonable so long as he can get a line shut down from Xcel Energy. <br />Chairperson Howard recommended all yard dedicated equipment back -up alarms be hushed. Mr. Murlowski explained <br />this had already been taken into effect on his yard. As a fair warning to the neighbors, he reported that the equipment <br />used to build complete the berm would not have hush backup alarms. <br />Commissioner Danger thanked Mr. Murlowski for his willingness to work with the City and the neighboring residents to <br />resolve the sound issues. He questioned how staff arrived at the 56.5 decibel level. Planner Gundlach reported this was <br />the level approved in City Ordinance and was determined to be the reduction level that could be achieved by Belair <br />Excavating in 2010. She reported that prior to 2010, there was no sound barrier. After that time, the City worked with <br />Belair to reduce the noise levels for the benefit of the adjacent residential area. <br />Commissioner Danger was pleased that the storage piles would be moved as this too would push operational noises away <br />from the residential neighborhood. <br />Chairperson Howard requested the Commission discuss the color of the concrete wall, landscaping requirements and the <br />recommended completion date for the berm. <br />Commissioner Danger did not believe it would be necessary to paint the concrete wall. <br />Commissioner Erickson agreed. <br />Mr. Glynn did not believe the concrete berm had to be painted, however, he would like to see the remainder of the berm <br />planted with trees. <br />Commissioner McPherson noted the berm would have growth on it, even if trees were not planted. Planner Gundlach <br />reported that the berm would be inspected annually to ensure there were no erosion issues and that it was properly <br />vegetated. She reported that vegetation was fully established on the portion of the berm that was already complete. <br />The Commission recommended the berm completion date be changed to September 30, 2014, requiring that the dumping <br />platform be relocated within 7 -10 days of receiving Council approval. Mr. Murlowski requested he be allowed to have 10 <br />working business days to complete the relocation of the dumping platform. <br />Motion by Commissioner McPherson, seconded by Commissioner Erickson to close the Public Hearing. <br />Approved 6 -0. <br />Motion by Commissioner McPherson, seconded by Commissioner Erickson, to approve staff recommendation <br />amending the berm completion date to September 30, 2014, and requiring the dumping platform to be relocated <br />within 10 working business days after receiving City Council approval. <br />Approved 6 -0. <br />(C) Caleb Wilkins on behalf of Eurotech Auto requests a Site Plan and Nonconforming Use Permit to allow <br />construction of a 26' x 32' open air car port/canopy with 7' breezeway at the northeast corner of the <br />existing building at 480 8' AVENUE NW. <br />
The URL can be used to link to this page
Your browser does not support the video tag.