Laserfiche WebLink
Stinson <br />Road Crossing <br />Location <br />6/18/2014 <br />Date <br />Material Amount Cost Total <br />Differents in cost for 1U' Ties <br />40 <br />33 <br />$ 1,320.00 <br />Used <br />20 <br />$ <br />Switch Ties <br />$ <br />Rail (new) <br />861 <br />$ <br />Used <br />250 <br />$ - <br />Plates (Pandrol - Difference) <br />430 <br />10 <br />$ 800.00 <br />Spikes <br />1. <br />$ - <br />Angle Bars <br />90 <br />$ <br />Offset Angle Bars <br />200 <br />$ - <br />Insulated Angle Bars <br />365 <br />$ <br />Boits <br />2.5 <br />$ <br />Anchor <br />1.15 <br />$ - <br />Concrete Crossing per track foot <br />64 <br />200 <br />$ 12,800.00 <br />Switch Point ( Samson) <br />1300 <br />Switch point (Regular) <br />250 <br />$ <br />Stock Rail <br />1400 <br />$ <br />Switch Stand (backsaver) <br />1150 <br />$ - <br />#9 Switch tie package <br />7,150 <br />$ <br />#9 switch package (no ties) <br />16,600 <br />$ <br />Total Material <br />$ 14,920.00 <br />Equipment <br />Ea. <br />Hours Cost <br />Tamper <br />2200 <br />5 - <br />Regulator <br />100 <br />$ <br />Spiker <br />$ <br />Tie inserter <br />1 <br />$ - <br />Tie crane <br />1 <br />$ - <br />Trucking /Freight <br />64 <br />$ 2,300.00 <br />Pettibone (day) <br />200 <br />$ <br />Loader (day) <br />300 <br />$ <br />Vehicles <br />25 <br />$ <br />Total Equipment <br />$ 2,300.00 <br />Labor <br />Ea. <br />Hours <br />Cost <br />Foreman <br />85 <br />$ - <br />Laborer <br />70 <br />$ <br />B & B <br />70 <br />$ <br />Supervisor <br />110 <br />$ <br />$ <br />Total Labor <br />$ <br />Grand Total <br />$ 17,220-00 <br />