Laserfiche WebLink
RESOLUTION NO. 14-073 <br />STATE OF MINNESOTA <br />COUNTY OF RAMSEY <br />CITY OF NEW BRIGHTON <br />RESOLUTION ORDERING PREPARATION OF A FEASmILTY STUDY ON <br />CITY PROJECT 15-1,2015 STREET REHABILITATION. <br />WHEREAS, it is proposed to improve Windsor Lane; Windsor Court; and <br />Windsor Way and to assess the benefited property for all or a portion of the cost of the <br />improvement, pursuant to Minnesota Statutes, Chapter 429. <br />NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of New <br />Brighton: <br />1. That the proposed improvement, called City Project 15-1, 2015 Street <br />Rehabilitation, be referred to the City Engineer for study and is instructed to report <br />to the Council with all convenient speed advising the Council in a preliminary way <br />as to whether the proposed improvement is necessary, cost-effective, and feasible; <br />whether it should best be made as proposed or in connection with some other <br />improvement; the estimated cost of the improvement as recommended; and a <br />description of the methodology used to calculate individual assessments for <br />affected parcels. <br />2. That the City Council authorizes the Public Works Director to work with a <br />Professional Land Surveyor and the City Attorney to prepare right of way <br />acquisition and/or easement documents to be included in the Feasibility Study. <br />3. That the City Council authorizes the Public Works Director to obtain a proposal <br />for Engineering Services for traffic signalization, streetscaping, and roadway <br />improvements on 10th Street NW. <br />Adopted this of 26th day of August, 2014. <br />ArrEST: <br />t~YJ~ <br />Deputy City Clerk <br />(SEAL)