<br /> INSPECTIONS AND MAINTENANCE EWATERING AND BASIN DRAINING EROSION CONTROL MEASURES C.W.P.0 12-1366
<br /> 1. THE PERMITTEE(S)(EITHER THE OWNER OR OPERATOR)MUST ROUTINELY INSPECT THE 1. DEWATERING OR BASIN DRAINING(E.G.,PUMPED DISCHARGES,TRENCH/DITCH CUTS FOR CONSTRUCTION ACTIVITY INFORMATION ORIGINAL DATE
<br /> CONSTRUCTION SITE ONCE EVERY SEVEN(7)DAYS DURING ACTIVE CONSTRUCTION AND WITHIN DRAINAGE)RELATED TO THE CONSTRUCTION ACTIVITY THAT MAY HAVE TURBID OR SEDIMENT STRUCTURAL PRACTICES JUNE 1 2012
<br /> 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. LADEN DISCHARGE WATER MUST BE DISCHARGED TO A TEMPORARY OR PERMANENT A)PROJECT NAME: ACCUSTREAM 1. SILT FENCE-WILL BE INSTALLED PRIOR TO ANY GRADING ACTIVITIES ALONG THE PERIMETER
<br /> 2. ALL INSPECTONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN SEDIMENTATION BASIN ON THE PROJECT SITE WHENEVER POSSIBLE. IF THE WATER CANNOT BE OF THOSE PORTIONS OF THE SITE WHICH ARE DOWNSTREAM OF STORM WATER RUN-OFF,
<br /> WRITING AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP IN ACCORDANCE WITH DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER,IT MUST B)PROJECT LOCATION: 309 FIFTH AVE,NEW BRIGHTON,MNI
<br /> RECORD DETENTION.RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY SHALL TREATED WITH THE APPROPRIATE BMP,SUCH THAT THE DISCHARGE DOES NOT ADVERSELY 2 INLET SEDIMENT PROTECTION-WIMCO OR OTHER APPROVED DEVICES TO BE USED FOR
<br /> INCLUDE: SHALL INCLUDE: AFFECT THE RECEIVING WATER OR DOWNSTREAM LANDOWNERS THE PERMITTEE(S)MUST EXISTING AND PROPOSED STORM SEWER CASTINGS
<br /> A.DATE AND TIME INSPECTIONS; ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. gN C) ERAI PROJECT OPRCRPTIdh THE DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP,SAND BAGS,PLASTIC 3. ROCK CONSTRUCTION ENTRANCE-SHALL BE USED AT ALL LOCATIONS WHERE CONSTRUCTION
<br /> B.NAME OF PERSON(S)CONDUCTING INSPECTIONS; SHEETING OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION THIS PROJECT WILL CONSIST OF A BUILDING ADDITION TO AN EXISTING BUILDING AND PARKING LOT VEHICLES LEAVE SITE ONTO HARD SURFACE ROADS.
<br /> C.FINDINGS OF INSPECTIONS,INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS; CONTROL MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. RECONFIGURATION.
<br /> D.CORRECTIVE ACTONS TAKEN(INCLUDING DATES,TIMES,AND PARTY COMPLETINGOTHER CONTROLS
<br /> 2. ALL WATER FROM DEWATERING OR BASIN DRAINING ACTIVITIES MUST BE DISCHARGED N A A FILTRATION BASIN AND POROUS PAVEMENT ARE PROPOSED WATER MANAGEMENT FEATURES TO
<br /> MAINTENANCE ACTIVITIES); MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS,EROSION IN RECEIVING CHANNELS OR MEET CITY AND RICE CREEK WATERSHED DISTRICT RULES. 1, CONSTRUCTION WASTE MATERIALS-ALL WASTE MATERIALS GENERATED AS A RESULT OF SITE
<br /> E.DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 1/2 INCH(0.5 INCHES) ON DOWNSLOPE PROPERTIES,OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE CONSTRUCTION SHALL BE COLLECTED AND REMOVED ACCORDING TO ALL LOCAL AND/OR STATE
<br /> IN 24 HOURS; AND IMPACT TO THE WETLAND. SOIL DISTURBING ACTIVITIES WILL INCLUDE: INSTALLATION OF A ROCK CONSTRUCTON ENTRANCE; WASTE MANAGEMENT REGULATIONS BY A UCENSED SOLID WASTE MANAGEMENT COMPANY. THE
<br /> F.DOCUMENTATION OF CHANGES MADE TO THE SWPPP. INSTALLATION OF SILT FENCE WHERE SURFACE RUN-OFF LEAVES SITE; SITE GRADING INCLUDING CONTRACTOR WILL ENSURE THAT ALL SITE PERSONNEL ARE INSTRUCTED IN THESE PRACTICES.
<br /> SOILS IMPORT; UTIUTY INSTALLATION;CURB AND PAVEMENT PAVEMENT CONSTRUCTION; BUILDING
<br /> 3. WHERE PARTS OF THE CONSTRUCTION SITE HAVE UNDERGONE FINAL STABIUZATION,BUT WORK CONSTRUCTON; AND PREPARATION FOR TURF RESTORATION. 2. HAZARDOUS WASTES-ALL HAZARDOUS WASTE MATERIALS SHALL BE STORED PROPERLY TO
<br /> REMAINS ON OTHER PARTS OF THE SITE,INSPECTIONS OF THE STABILIZED AREAS MAY BE PREVENT SPILLS AND VANDAUSLL WHEN NECESSARY,HAZARDOUS WASTES WILL BE DISPOSED OF
<br /> REDUCED TO ONCE PER MONTH.WHERE WORK HAS BEEN SUSPENDED DUE TO FROZEN GROUND AMENDMENTS TO SWPPP IN THE MANNER SPECIFIED BY LOCAL AND/OR STATE REGULATION OR BY THE MANUFACTURER Z
<br /> CONDITIONS,THE REQUIRED INSPECTONS AND MAINTENANCE MUST TAKE PLACE AS SOON AS
<br /> RUNOFF OCCURS AT THE SITE OR PRIOR TO RESUMING CONSTRUCTION,WHICHEVER COMES FIRST. THE PERMITTEE(S)MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL D)SITE AREAS: AFTER 3. SANITARY WASTE-ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS BY
<br /> A LOCAL.UCENSED WATER MANAGEMENT COMPANY,AS REQUIRED BY LOCAL REGULATION. ei
<br /> 4. ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE INSPECTED TO ENSURE REQUIREMENTS,SUCH AS ADDITIONAL OR MODIFIED BMPS,DESIGNED TO CORRECT PROBLEMS CONSTRUCTION CONSTRUCTION
<br /> INTEGRITY AND EFFECTIVENESS. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED,REPLACED,OR IDENTIFIED OR ADDRESS SITUATIONS WHENEVER: TOTAL SITE AREA 21B ACRES N
<br /> SUPPLEMENTED WITH FUNCTIONAL BMPS. THE PERMITEE(S)MUST INVESTIGATE AND COMPLYTOTAL ESTIMATED IMPERVIOUS 131 ACRES 1.73 ACRES H OFFSITE VEHICLEVEHICLE TRACKING-A ROCKCON THE PA PAVED STREETTRE HAS BEEN PROVIDED TO EtM
<br /> () 1. THERE IS A CHANGE IN DESIGN,CONSTRUCTION,OPERATION,MAINTENANCE,WEATHER OR REDUCE TRACKING OF SEDIMENTS. THE ADJACENT TO THE SITE O
<br /> WITH THE FOLLOWING INSPECTION AND MAINTENANCE REQUIREMENTS: SEASON CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO TOTAL ESTIMATED PERVIOUS 0.87 ACRES 0.45 ACRES ENTRANCE SHALL BE SMEPT/SCRAPED ON AN AS-NEEDED BASIS.OR AS DETERMINED BY THE Z
<br /> A. ALL SILT FENCES MUST BE REPAIRED,REPLACED,OR SUPPLEMENTED WHEN THEY BECOME SURFACE WATERS OR UNDERGROUND WATERS; CITY. DUMP TRUCKS HAULING LOOSE MATERIALS(SAND,TOPSOIL ETC.)TO AND/OR FROM THE rn
<br /> SITE SHALL BE COVERED WITH A TARPAULIN.
<br /> NONFUNCTIONAL(DEVELOP TEARS,DETACH FROM POSTS,POST BECOME DISLODGED FROM 2 INSPECTIONS OR INVESTIGATIONS BY SITE OPERATORS,LOCAL,STATE OR FEDERAL OFFICIALS E)IQTALOLSTIIRBFO AREA: 1.2 ACRES u>1
<br /> GROUND,ETC.)OR THE SEDIMENT REACHES 1/3 OF THE HEIGHT OF THE FENCE. THESE INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE F)RECEIVING WATERS 5. VEHICLE CLEANING AND CONCRETE WASHOUT-NO ENGINE DEGREASING IS ALLOWED ON-SITE. R
<br /> REPAIRS MUST BE MADE WITHIN 24 HOURS OF DISCOVERY,OR AS SOON AS THE FIELD DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS OR THAT THE EXTERNAL WASHING OF VEHICLES TO BE CONFINED TO A DEFINED AREA("BONE YARD')ON-SITE.
<br /> CONDITIONS ALLOW ACCESS. DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCES,OR TYPE OF SPECIAL IMPAIRED CONTRACTOR TO PROVIDE DESIGNATED CONCRETE TRUCK WASHOUT AREA WITH APPROPRIATE
<br /> B. TEMPORARY AND PERMANENT SEDIMENTATION PONDS MUST BE DRAINED AND THE SEDIMENT NAME OF WATER BODY WATER BODY WATER? WATER? SIGNAGE WASHOUT AREA IS TO BE A MINIMUM OF 50'FROM STORM DRAINS.DITCHES,PONDS.OR
<br /> 3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS IN STORM
<br /> REMOVED WHEN THE DEPTH OF THE SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE WATER DISCHARGES ASSOCIATED WITH CONSTRUCTON ACTIVITY,OR THE SWPPP IS NOT REGIONAL PONDS POND NO NO OTHER STORMWATER FEATURES. ALL UQUID AND SOLID WASTE GENERATED BY CONCRETE
<br /> STORAGE VOLUME.DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF CONSISTENT WITH'THE TERMS AND CONDITIONS OF THIS PERMIT. LAKE JOHANA LAKE NO YES WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACIUTY OR n
<br /> DISCOVERY OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. IMPERMEABLE UNER(E.G.COMPACTED CLAY UNER,IMPERMEABLE GEO-MEMBRANE). AFTER WASTE
<br /> 4. AT ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE,THE MPCA MAY DETERMINE THAT THE CONCRETE IS SET.BREAK-UP AND DISPOSE OF PROPERLY. A SIGN MUST BE INSTALLED
<br /> C. SURFACE WATERS,INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS,MUST BE PROJECTS STORM WATER DISCHARGES MAY CAUSE,HAVE REASONABLE POTENTIAL TO CAUSE,OR ADJACENT TO EACH WASHOUT AREA TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE
<br /> INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. THE PERMITEE(S) CONTRIBUTE TO NON-ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD. IF MPCA PROPER FACIUTIES.
<br /> MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS,INCLUDING MAKES SUCH A DETERMINATION,THE MPCA WILL NOTIFY THE PERMITTEE(S)IN WRITING IN C)4TE cFhiQN2NCF C ORADAC AND MFASI EROSION CDYTROL Ij;E;y W Vl h
<br /> DRAINAGE WAYS,CATCH BASINS,AND OTHER DRAINAGE SYSTEMS,AND RE-STABILIZE THE AREAS RESPONSE,THE PERMITTEE(S)MUST DEVELOP A SUPPLEMENTAL BMP ACTION PLAN OR • PRIOR TO ANY GRADING OPERATIONS,THE CONTRACTOR SHALL INSTALL ROCK CONSTRUCTION m ;
<br /> WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL THE REMOVAL AND STABILIZATION MUST APPROPRIATE SWPPP AMENDMENTS DESCRIBING SWPPP MODIFICATIONS TO ADDRESS THE ENTRANCES(LOCATIONS TO BE DETERMINED-COORDINATE WITH OWNER)AND PERIMETER SILT INSPECTIONS AND MAINTENANCE PROCEDURES <cWJ w S
<br /> TAKE PLACE WITHIN SEVEN(7)DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL REGULATORY, IDENTIFIED CONCERNS AND SUBMIT INFORMATON REQUESTED BY THE MPCA,WHICH MAY zz¢U
<br /> OR PHYSICAL ACCESS CONSTRAINTS. THE PERMITEE SHALL USE ALL REASONABLE EFFORTS TO FENCE AS SHOWN ON PLAN. (CONTACT CITY TO INSPECT EROSION CONTROL MEASURES PRIOR TO Z E
<br /> OBTAIN ACCESS, IF PRECLUDED,REMOVAL AND STABIUZATION MUST TAKE PLACE WITHIN SEVEN INCLUDE AN INDIVIDUAL PERMIT APPLICATION. IF MPCA'S WRITTEN NOTIFICATION REQUIRES A GRADING OPERATIONS,IF NECESSARY.) ADDITIONAL SILT FENCE MAY BE NECESSARY IF LOCAL (ALSO SEE'INSPECTIONS AND MAINTENANCE"UNDER"GENERAL EROSION AND SEDIMENT CONTROL) g J
<br /> RESPONSE,FAILURE TO RESPOND WITHIN THE SPECIFIED TIME FRAME CONSTITUTES A PERMIT CONDITIONS REQUIRE. U. qq INp
<br /> (7)CALENDAR DAYS OF OBTAINING ACCESS. THE PERMITEE IS RESPONSIBLE FOR CONTACTING VIOLATION T. 'w W
<br /> ALL LOCAL REGIONAL STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPUCABLE PERMITS, THE FOLLOWING ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT WILL BE USED TO -J
<br /> PRIOR TO CONDUCTING ANY WORK. • RELOCATE EXISTING BURIED AND OVERHEAD UTILITIES AS NECESSARY FOR CONSTRUCTION. MAINTAIN EROSION AND SEDIMENT CONTROLS F p a ?
<br /> D. CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OFF-SITE FINAL STABILIZATION Z 6
<br /> e THE CONTRACTOR DIRECT ALL CONSTRUCTION SITE RUN-OFF TO TEMPORARY SEDIMENTATION TRAPS • ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY,IT 4 ;u
<br /> SEDIMENT TRACKING ONTO PAVED SURFACES TRACKED SEDIMENT MUST BE REMOVED FROM THE PERMITEE(S)MUST ENSURE FINAL STABIUZATION OF THE SITE. THE PERMITEE(S)MUST OR OTHER ENGINEER-APPROVED SEDIMENT CONTROL MEASURES PRIOR TO DISCHARGE FROM SITE. WILL BE INITIATED WITHIN 24 HOURS OR REPORT. r o 4 i
<br /> i
<br /> ALL OFF-SITE PAVED SURFACES,WITHIN 24 HOURS OF DISCOVERY,OR IF APPLICABLE,WITHIN A SUBMIT A NOTICE OF TERMINATION WITHIN 30 DAYS AFTER FINAL STABIUZATION IS COMPLETE, DEWATERING AND/OR BASIN DRAINING DISCHARGE SHALL BE DIRECTED TO TEMPORARY • A MAINTENANCE REPORT WILL BE MADE AFTER EACH INSPECTION. w=ZSHORTER TIME. OR ANOTHER OWNER/OPERATOR (PERMITTEE)HAS ASSUMED CONTROL OVER ALL AREAS OF THE SEDIMENTATION BASINS/TRAPS WHEREVER POSSIBLE. ALL DISCHARGE POINTS SHALL BE F o1 n
<br /> SITE THAT HAVE NOT UNDERGONE FINAL STABILIZATION.FINAL STABILIZATION CAN BE ACHIEVED ADEQUATELY PROTECTED FROM EROSION AND SCOUR THROUGH THE USE OF APPROVED ENERGY Y z
<br /> E. THE PERMITTEE(S)ARE RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY IN ONE OF THE FOLLOWING WAYS: w < uJ
<br /> AND PERMANENT WATER QUALITY MANAGEMENT BMPS,AS WELL AS ALL EROSION PREVENTION DISSIPATION DEVICES. ITEM INSTALLATION INSPECTION 8 MAINTENANCE REMOVAL U p Z V
<br /> AND SEDIMENT CONTROL BMPS,FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. m F
<br /> THE PERMITTEE(S)ARE RESPONSIBLE UNTIL ANOTHER PERMITEE HAS ASSUMED CONTROL OVER 1. ALL SOIL DISTURBING AT THE SITE HAVE BEEN COMPLETED AND ALL SOILS MUST BE STABILIZED • TEMPORARY OR PERMANENT MULCH MUST BE UNIFORMLY APPLIED BY MECHANICAL OR HYDRAUUC SILT FENCE PRIOR TO COMMENCEMENT INSPECT AND MAINTAIN AFTER EACH AFTER TRIBUTARY w Q T VI v1
<br /> AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OVER THE MEANS AND STABIUZED BY DISC-ANCHORING OR USE OF HYDRAULIC SOIL STABIUZERS OF EARTHWORK OPERATIONS RAIN EVENT; REMOVE SEDIMENTS DRAINAGE AREAS IS S.a w
<br /> FINAL STABIUZATION,AND A NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MPCA ENTIRE PREVIOUS SURFACE AREA,OR OTHER EQUIVALENT MEANS NECESSARY TO PREVENT SOIL _a WHEN IT HAS REACHED 1/3RD HEIGHT STABIUZED i K K u.
<br /> d
<br /> (SEE TERMINATION OF COVERAGE). FAILURE UNDER EROSIVE CONDITIONS AND; • THE CONTRACTOR SHALL PERFORM SITE GRADING ON AN AREA-BY-AREA BASIS TO MINIMIZE ROCK PRIOR TO COMMEHCFIU?IT INSPECT REGULARLY; REPAIR AS PRIOR TO PAVING %i u
<br /> F. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE,OFF-SITE ACCUMULATONS MUST BE REMOVED A. ALL DRAINAGE DITCHES,CONSTRUCTED TO DRAIN WATER FROM THE SITE AFTER CONSTRUCTION IS UNSTABIUZED AREAS. AS EACH AREA IS COMPLETED.ALL EXPOSED SOILS MUST HAVE CONSTRUCTION OF EARTHWORK OPERATIONS NEEDED m
<br /> IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS(E.G. COMPLETE,MUST BE STABILIZED TO PRECLUDE EROSION; TEMPORARY EROSION CONTROL PROTECTION OR PERMANENT COVER WITHIN SEVEN(7)DAYS ENTRANCE
<br /> FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN B, ALL TEMPORARY SYNTHETIC,AND STRUCTURAL EROSION PREVENTION AND SEDIMENT CONTROL TELPORARY DURING EARTHWORK INSPECT AND MAINTAIN AFTER DURING FINAL GRADING
<br /> AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS), BEST MANAGEMENT PLANS(SUCH AS SILT FENCE)MUST BE REMOVED AS PART OF THE SITE THE
<br /> E CONTRACTOR
<br /> SHALL SEED,
<br /> FERTILIZER WHICH SHALL CONFORM
<br /> WITHTHE FOLLOWING MNDOT SPECIFICATIONS AS MODIFIED BELOW. SEDIMENTATION OPERATIONS HEAVY RAINFALLS; REMOVE
<br /> 5. ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING FINAL STABIUZATION; AND BASINS/TRAPS SEDIMENT AS NEEDED
<br /> CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREA AND THESE AREAS ARE C. THE PERMITEE(S)MUST CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM INLET PROTECTION WITHIN 24 HOURS OF INSPECT AND MAINTAIN AFTER EACH AFTER TRIBUTARY 2
<br /> PROTECTED FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY ITEM MNOOT SPECIFICATION TES
<br /> INFILTRATION AREA. INSTALLATION RAIN EVENT; CLEAN/REPLACE WHEN DRAINAGE AREAS IS i U
<br /> MANAGEMENT BASINS.SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED SOO 31178 1/0 CAPACITY IS REACHED STABILIZED E, S S.
<br /> BACK INTO THE BASIN,CONVEYANCE AND DRAINAGE WAYS DISCHARGING OFF-SITE OR TO = 5
<br /> SURFACE WATERS. THE CLEAN OUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN SEED•• 3878 RIP-RAP MID WITHIN 24 HOURS OF INSPECT AND MAINTAIN AT LEAST PERMANENT C Il
<br /> THE BASIN TO DESIGN CAPACITY. •FOR TURF ESTABUSITYFNT 'MOOT LIIXTME 280(100 LB5/ACNE) FILTER FABRIC INSTALLATION ANNUALLY AND AFTER HEAVY RAIN
<br /> TRAINING REQUIREMENTS _OR EVENTS RI o
<br /> 1. PERMITTEE(S)MUST COMPLY WITH THESE TRAINING REQUIREMENTS NO LATER THAN FEBRUARY 2 FOR RESIDENTIAL CONSTRUCTION ONLY,FINAL STABIUZATION HAS BEEN ACHIEVED WHEN MNDOT MIXTURE 270(120 LBS/ACRE) SEED AND MULCH AFTER FINAL GRADING INSPECT AND MAINTAIN AFTER PERMANENT WO CO Iw-F
<br /> 1,2010. THE PERMITTEE(S)SHALL ENSURE THE INDIVIDUAL IDENTIFIED IN THIS PART HAVE BEEN TEMPORARY EROSION PROTECTION AND DOWN GRADIENT PERIMETER CONTROL FOR INDIVIDUAL LOTS OPERATIONS HEAVY RAIN EVENTS; REPLACE = �` 4 w
<br /> HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN TRANSFERRED TO THE HOMEOWNER. TEMPORARY FALL COVER MNDOT MIXTURE 100B(100 LBS/ACRE) V-OUT AREAS IMMEDIATELY; REPLEv m
<br /> TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS. THE PERMITTEE(S)SHALL ADDITIONALLY,THE PERMITEE MUST DISTRIBUTE THE MPCA"HOMEOWNER FACT SHEET TO THE SPRING/SUMMER MNDOT MIXTURE 110(AT 100 LBS/ACRE) WAS3
<br /> ENSURE THE TRAINING IS RECORDED IN OR WITH THE SWPPP BEFORE THE START OF CONSTRUCTON. HOMEOWNER TO INFORM THE HOMEOWNER OF THE NEED FOR,AND BENEFITS OF,FINAL 1-2 YEARS COVER MNDOT MIXTURE 150(AT 40 LEIS/ACRE) re W R a
<br /> A. WHOSTABIUZATION.MUST BE TRAINED: 2-5 YEARS COVER MNDOT MIXTURE 190(AT 60 LEIS/ACRE) �
<br /> I. INDIVIDUAL(S)PREPARING THE SWPPP FOR THE PROJECT MULCH J882(TYPE 1-DISC ANCHORED)
<br /> IL INDIVIDUAL(S)OVERSEEING IMPLEMENTATION OF,REVISING,AND AMENDING THE SWPPP RECORD RETENTION FERTILIZER 3881
<br /> AND INDIVIDUAL(S)PERFORMING INSPECTIONS AS REQUIRED AS PART OF THIS PERMIT. THE SWPPP,ALL CHANGES TO IT,AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE W0 FBER W.UdFET 3B8S(CATEGORY 2)
<br /> ONE OF THESE INDIVIDUAL(S)MUST BE AVAILABLE FOR AN ON-SITE INSPECTION WITHIWowKEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITEE WHO HAS OPERATIONAL CONTROL PREPARED FOR:
<br /> 72 HOURS UPON REQUEST BY THE MPCA. OF THAT POTION OF THE SITE THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OF IN • MOW A MINIMUM OF ONCE PER 2 WEEKS ROSA
<br /> AN ON-SITE VEHICLE. ••SEEDED AREAS SHALL BE EITHER MULCHED OR COVERED BY FIBROUS
<br /> III. REPAIRUOF PERFORMING OR SUPERVISING THE INSTALLATION,MAINTENANCE,AND BLANKETS TO PROTECT SEEDS AND UMIT EROSION. ARCHITECTURAL
<br /> OF BMPS AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN ALL OWNER(S)MUST KEEP THE SWPPP,ALONG WITH THE FOLLOWING ADDITIONAL RECORDS,ON GROUP
<br /> THESE DUTIES. FILE FOR THREE(3)YEARS AFTER SUBMITTED OF THE NOT AS OUTLINED IN TERMINATION OF -- -
<br /> B. TRAINING CONTENT. THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE COVERAGE. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF THE NOT. • ALL EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE PLANS OR IMPLEMENTED IN THE
<br /> WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBIUTES WITH REGARD TO ACTIVITIES FIELD SHALL BE IN ACCORDANCE WITH THE CITY AND NPDES PHASE II PERMIT REQUIREMENTS.AND
<br /> COVERED UNDER THIS PERMIT FOR THE PROJECT. AT LEAST ONE INDIVIDUAL PRESENT THE MPCA'S"PROTECTING WATER OUAUTY IN URBAN AREAS BEST MANAGEMENT PRACTICES FOR
<br /> ON THE PERMITTED PROJECT SITE(OR AVAILABLE TO THE PROJECT SITE IN 72 HOURS) 1. ANY OTHER PERMITS REQUIRED FOR THE PROJECT; MINNESOTA.
<br /> MUST BE TRAINED IN THE JOB DUTIES DESCRIBED IN THIS PERMIT. 2. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION
<br /> 3 ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, • ANY TEMPORARY OR PERMANENT DITCH THAT DRAINS WATER FROM THE CONSTRUCTION SITE OR
<br /> C. TRAINING DOCUMENTATION INCLUDING ALL RIGHT OF WAY,CONTRACTS,COVENANTS,AND OTHER BINDING REQUIREMENTS DIVERTS WATER AROUND A SITE,MUST BE STABIUZED WITHIN 200 LINEAL FEET FROM THE ��
<br /> I. DOCUMENTATION MUST BE IN OR WI TI TH E SWPPP OR BE AVAILABLE WITHIN 72 HOURS REGARDING PERPETUAL MAINTENANCE; AND PROPERTY UNE OR FROM THE POINT OF DISCHARGE TO ANY SURFACE WATER. STABILIZATION
<br /> UPON REQUEST. 4. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORM WATER MUST TAKE PLACE WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER
<br /> II, NAMES OF THE PERSONNEL ASSOCIATED WITH THIS PROJECT THAT ARE REQUIRED TO MANAGEMENT SYSTEMS. • THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO ALL ADJACENT PROPERTY LINES AND MAKE
<br /> BE TRAINED PER PART 1,A,OF THIS SECTION. SURE THE EROSION CONTROL PRACTICES INPLACE IN THOSE AREAS PREVENT MIGRATION OF SITE PLANNING
<br /> III. DATES OF TRAINING AND NAME OF INSTRUCTOR(S)AND ENTITY PROVIDING TRAINING. TERMINATION OF COVERAGE SEDIMENT ONTO ADJACENT PROPERTIES. &ENGINEERING
<br /> IV. CONTENT OF TRAINING COURSE OR WORKSHOP(INCLUDING NUMBER OF HOURS OF TRAINING).
<br /> I. PERMITTEE(S)WISHING TO TERMINATE COVERAGE UNDER THIS PERMIT MUST SUBMIT A NOTICE • THE CONTRACTOR SHALL MAINTAIN SILT FENCE,INCLUDING THE REMOVAL OF ACCUMULATED PLOWS
<br /> C. THE PERMITTEE(S)SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL STATE, OOFFTEN INATI (NOT)TO
<br /> PERMITTEE(S)MPCA.
<br /> COMPLIANCE
<br /> TO THE
<br /> E PERMIT
<br /> T IS UNDER UNTIL
<br /> A SEDIMENT,THROUGH COMPLETION OF BUILDING CONSTRUCTION. SILT FENCE TO BE REMOVED ONLY
<br /> FEDERAL AGENCIES,PROFESSIONAL ORGANIZATIONS,OR OTHER ENTITIES WITH EXPERTISE INAFTER COMPLETION OF BUILDING CONSTRUCTION AND UPON ESTABLISHMENT OF VEGETATION.
<br /> EROSION PREVENTION,SEDIMENT CONTROL OR PERMANENT STORMWATER MANAGEMENT SUCH TERMINATES AT MIDNIGHT OF THE DAY THE NOT IS SIGNED.
<br /> AS THE UNIVERSITY OF MINNESOTA,MINNESOTA EROSION CONTROL ASSOCIATION,SOIL AND • THE CONTRACTOR SHALL PROVIDE WOOD FIBER BLANKET FOR ALL AREAS OF CONCENTRATED FLOW ENGINEERING,
<br /> WATER CONSERVATION DISTRICTS.OR THE MPCA. 2. ALL PERMITTEE(S)MUST SUBMIT A NOT WITHIN THIRTY(30)DAYS AFTER ONE OR MORE OF AND FOR ALL SLOPES 3:1 OR GREATER. 6n6 LAKE DRIVE
<br /> THE FOLLOWING CONDITIONS HAVE BEEN MET: SUITE 110
<br /> A. FINAL STABILIZATION HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE • PROTECT ALL STORM WATER MANAGEMENT FACILITIES FROM CONSTRUCTION RUN-OFF. LINO LAKES,MN 55014
<br /> PERMITEE IS RESPONSIBLE(INCLUDING THE REMOVAL OF ALL TEMPORARY EROSION CONTROL CONTRACTOR TO INSTALL AND CONSTRUCT SAID FACILITIES ONCE SITE HAS BEEN STABIUZED.
<br /> MEASURES SUCH AS SILT FNCE,AND IF APPUCABLE,RETURNING AGRICULTURAL LAND TO ITS PREPHONE:(651)367A210
<br /> POLLUTION PREVENTION MANAGEMENT MEASURES IF ANY SLOPES APPEAR TO BE FAILING,THE CONTRACTOR SHALL PROVIDE ADDITIONAL SILT FENCE. FAX:(651)361-B701
<br /> CONSTRUCTION AGRICULTURAL USE); BIOROLLS AND EROSION CONTROL BLANKET AS NEEDED.
<br /> THE PERMITEE(S)SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT B. ANOTHER OWNER/OPERATOR(PERMITEE)HAS ASSUMED CONTROL ACCORDING TO PART ILB.S OF
<br /> MEASURES
<br /> TH
<br /> E NE SITE: • THE CONTRACTOR SHALL FINAL GRADE SWALE AREAS UPON STABILIZATION OF UPSTREAM AREAS
<br /> MPCA PERMIT NO.MN R100001 OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY
<br /> 1. SOLID WASTE: COLLECTED SEDIMENT,ASPHALT AND CONCRETE MILLINGS,FLOATING DEBRIS, STABIUZED; OR • THE CONTRACTOR SOD ALL DISTURBED DRAINAGE AREAS,INCLUDING SHALES,OVERFLOWS,AROUND
<br /> PAPER,PLASTIC,PROPERLY FABRIC,CD MUST CON AND DEMOLITION DISPOSALDEOSIS AND IREMR WASTES MUST BE C. FOR RESIDENTIAL CONSTRUCTION ONLY,TEMPORARY EROSION PROTECTION AND DOWN GRADIENT
<br /> DISPOSED OF AND MUST COMPLY WITH MPCA REQUIREMENTS. STORM SEWER FLARED-END SECTIONS,AND OFF-STREET CATCH BASINS.
<br /> PERIMETER CONTROL FOR INDIVIDUAL LOTS HAS BEEN COMPLETED AND THE RESIDENCE HAS
<br /> 2. HAZARDOUS MATERIALS: OIL GASOLINE,PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE BEEN TRANSFERRED TO THE HOMEOWNER. ADDITIONALLY,THE PERMITEE MUST DISTRIBUTE THE • UPON GRADING COMPLETION THE CONTRACTOR SHALL PROVIDE NATIVE TOPSOIL SEED.AND MULCH
<br /> PROPERLY STORED.INCLUDING SECONDARY CONTAINMENT,TO PREVENT SPILLS,LEAKS OR OTHER MPCA'S"HOMEOWNER FACTSHEET TO THE HOMEOWNER TO INFORM THE HOMEOWNER OF TIE ANCHORED WITH A STRAIGHT SET DISC WITHIN 46 HOURS OF FINAL GRADING.
<br /> DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT NEED FOR,AND BENEFITS OF,FINAL STABIUZATION.
<br /> VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH • EXCESS SOIL SHOULD BE TREATED UKE OTHER EXPOSED SOIL AND STABILIZED WITHIN 72 HOURS.
<br /> MPCA REGULATIONS. ANY SOIL STOCKPILES ARE TO HAVE SILT FENCE PLACED ON DOWNSTREAM SIDES AND SHALL NOT
<br /> 3 EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLE MUST BE UNITED TO A BE PLACED IN SURFACE WATERS.
<br /> DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS ALLOWED ON SITE. • ADJACENT STREETS SHALL BE KEPT CLEAN OF CONSTRUCTION MATERIALS,DIRT,AND OTHER
<br /> UNDESIRABLE MATERIALS. WHEN MATERIALS OR DEBRIS HAVE WASHED/FLOWED ONTO ADJACENT -
<br /> STREETS,IT IS THE CONTRACTOR'S RESPONSIBILITY TO SWEEP/SCRAPE STREETS AS NECESSARY OR
<br /> AS DIRECTED BY THE CITY. STORM WATER POLLUTION PREVENTION PLAN