My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-28-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 10-28-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 11:58:51 AM
Creation date
10/24/2014 4:13:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f 11rB=R01arr0N <br />the city that works for you <br />Report Number <br />Agenda Section <br />Council Meeting Date <br />REQUEST FOR COUNCIL CONSIDERATION <br />14 -261 <br />VI -2 <br />October 28, 2014 <br />ITEM DESCRIPTION: CONSIDERATION OF FINAL PAYMENTS TO COLUMBIA <br />HEIGHTS FOR PROJECT 13 -7, STINSON BOULEVARD CONCRETE REPAIRS & <br />OVERLAY PROJECT _ <br />DEPARTMENT HEAD'S APPROVAL: CAM <br />CITY MANAGER'S APPROVAL: <br />No comments to supplement this re ort Comments attached <br />Recommendation: To approve Final Pay s for City <br />and Stinson Boulevard Overlay Project. <br />Project 13 -7, Stinson Boulevard Concrete Repairs <br />Legislative History: April 16, 2013: Concrete Repair Bids opened by Columbia Heights Staff <br />April 22, 2013: Columbia Heights Council Meeting to Approve Low Bid <br />April 23, 2013: Approve Joint Powers Agreement with Columbia Heights <br />May 20, 2014: Bituminous Overlay Bids opened by Columbia Heights Staff <br />May 27, 2014: Columbia Heights Council Meeting to Approve Low Bid <br />Financial Impact: The final breakout for the work located in New Brighton is as follows: <br />2013 Concrete Street Rehabilitation New Brighton Portion <br />$793,431.56 $58,972.50 * 1.08 = $63,690.30 <br />2014 Bituminous Overlay <br />$283,188.58 <br />New Brighton Portion <br />$45,924.86 * 1.08 = $49,598.85 <br />The Joint Powers Agreement includes an 8% engineering/administration fee, bringing New Brighton's <br />financial obligation to $63,690.30 and $49,598.85 for a total of $113,289.15. <br />Explanation: The work within New Brighton was only a small portion of the overall project. The impacts to <br />New Brighton included the eastern half of Stinson Boulevard, from Fairway Drive to 325' north of North <br />Upland Crest. Per the Joint Powers Agreement, Columbia Heights designed the plans, tabulated bids, <br />inspected the project and administered the contract. In the summer of 2013 the concrete portion of Stinson <br />north of 5th Street NW had panels replaced, and joints repaired as needed. In the summer of 2014 the <br />bituminous portion of the project included removing the top 3- inches of bituminous with a milling machine <br />and providing a new 3 -inch lift of asphalt. <br />Costs and Funding: This project will be funded from Fund 422. Based on the project bids it was anticipated <br />that the total project costs would be $116,304.08, and the final project costs were $113,289.15. <br />— XAb <br />Gr M. yffeIIJPK <br />Director of Public Works <br />Attachments: Cost Share Letters from Columbia Heights <br />Stinson Boulevard Cost Breakdown <br />Map of 2013/2014 Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.