My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-28-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 10-28-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 11:58:51 AM
Creation date
10/24/2014 4:13:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
structure to the nearest overhead electrical power line which serves more than 1 dwelling <br />or place of business, less five feet. <br />Being the antennas are being mounted on an existing tower, this criterion does not apply. <br />F. Only one such structure exceeding the district height limitations shall exist at any one <br />time on any residentially zoned and used lot or parcel. <br />The parcel the existing tower is located on is zoned for heavy industrial uses. <br />G. Application for the permit must include construction drawings showing proposed <br />method of installation, structural engineering analysis, and a site plan depicting structures <br />and plantings on the property and all adjacent properties. At the request of the <br />administrative authority, documentation of a maintenance program may be required. <br />A greater level of detailed construction drawings will be submitted at the time of building <br />permit. These plans will be reviewed by the City's Building Official and Planning <br />Coordinator. <br />H. If any modifications are made to the structure, the City shall have the authority to <br />require proof that the addition, change, or modification is in conformity with the permit <br />and the Uniform Building Code. <br />This will be verified at the time of Building Permit. <br />I. The owner of such a structure shall assume complete liability in case of personal or <br />property damage. <br />T- Mobile Central LLC takes responsibility for complete liability in case of personal <br />and/or property damages. <br />Staff finds all criteria of Section 4 -600 (2) have been met. <br />Section 4 -600 (4) states that wireless telecommunication towers /antenna shall be subject to <br />approval of a special use permit. A special use permit shall be considered provided it is <br />determined that the location and size of the use and type of operation involved therein shall not <br />be injurious to the public health, safety, convenience, or general welfare and, shall not injure or <br />adversely affect the adjacent area or property values. The Planning Commission, in making a <br />recommendation, and the City Council, in acting upon the special use permit, shall consider the <br />following factors: <br />A. The application for special use permit shall be processed according to Chapter 8 of <br />the Zoning Code. <br />The applicant submitted for a Special Use Permit as required by Chapter 8 (see <br />compliance with the standards of Section 8 -130 below). <br />B. Applications for special use permits must meet the standards of Section 4 -600 (2), A- <br />I. <br />
The URL can be used to link to this page
Your browser does not support the video tag.