My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 10-28-2014
NewBrighton
>
Council
>
Packets
>
2014
>
2014 Council Work Session Materials
>
WS 10-28-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 8:33:34 AM
Creation date
10/31/2014 3:09:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council Report <br />August 26, 2014 <br />Citywide Crosswalk Safety Study <br />Page 3 of3 <br />Safety -September 2013): <br />Raised crosswalks (Appmdix E -Page 3) <br />Raised median islands (Appmdix E -Page 9) <br />Curb extensions (Appmdix E -Page 11) <br />Pedestrian hybrid beacom; (Appendix E -Page 13) <br />Rectangular rapid flashing beacoos (Appmdix E -Page 16) <br />Overhead lighting (Appmdix E -Page 18) <br />8. Determine Safe Routes to Scbool-Free busing radius vs. walking Iadius fur each school. <br />9. Consider the creation of trails amd sidewalks along major Roadways as .JJI'OPOSCd in the <br />Comprehensive Plan <br />I. Along Old Highway 8 (from County Road D to 5'6 AWIlue -narrow the road <br />from 415 lanes to 3 based 0IIl ADl). <br />11. Along 10th Street NW fum NBCC to bridge over I-35W. This is .JJI'OPOSCd to be <br />reconstructed in 201S. <br />III. CR E2 from Slit Avmue NW to bridge over I-35W. This is .JJI'OPOSCd to be <br />reconstructed in 2016. <br />IV. Create a plan for otIx7 siclew;db and 1raiIs listed in Comprehensive Plan. <br />71J. ~vI/ <br />Grant M. Wyffels'TrrE. <br />Director of Public Works <br />Attachments: <br />Citywide Crosswalk Safety Study daled 7#21#2014
The URL can be used to link to this page
Your browser does not support the video tag.