My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.01.27 WS Packet
NewBrighton
>
Council
>
Packets
>
2015
>
2015 Council Work Session Materials
>
2015.01.27 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2015 2:24:41 PM
Creation date
2/2/2015 2:24:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/26/2015 <br />Jones Lake Park - Phase One Preliminary Cost Estimate 1/28/03 <br />DescriptionUnitUnit CostTotal Cost <br />DEMOLITION / REMOVALS <br />Clearing & grubbing1LS1000010,000.00$ <br />Subtotal for removals 10,000.00$ <br />SITE GRADING <br />Rough grading - parking1160SY2.853,306.00$ <br />Final grading -parking1160SY0.3348.00$ <br />Silt fence4,000LF2.510,000.00$ <br />Subtotal for grading 13,654.00$ <br />PAVING / CONCRETE <br />Bituminous path (8') w/ base3400 LF2585,000.00$ <br />Bituminous driveway550 SY158,250.00$ <br />Bituminous parking w/ concrete curb12 Space100012,000.00$ <br />Subtotal for paving / surfacing 105,250.00$ <br />PLANTING/RESTORATION <br />Shade tree - 2 1/2" cal.10EA3003,000.00$ <br />Landscaping/seeding/restoration1LS10,00010,000.00$ <br />Subtotal for planting 13,000.00$ <br />BOARDWALK <br />8' wood boardwalk 3300EA120396,000.00$ <br />Subtotal for boardwalk 396,000.00$ <br />SIGNS/ENVIRONMENTAL EDUCATION <br />Signs - Directional and environmental1LS15,00015,000.00$ <br />Subtotal for signs 15,000.00$ <br />Site Lighting <br />Security light1EA35003,500.00$ <br />Subtotal for site lighting 3,500.00$ <br />SITE FURNISHINGS <br />Benches4EA9003,600.00$ <br />Picnic tables4EA8003,200.00$ <br />Trash receptacle6EA5503,300.00$ <br />Bike rack1EA400400.00$ <br />Portable toilet screen1EA20002,000.00$ <br />Chain link fence550LF105,500.00$ <br />Pedestrian bridges2EA1900038,000.00$ <br />Subtotal for site furnishings 56,000.00$ <br />ACQUISITION <br />Baptist Seminary land - acquire26 acresLS237000237,000.00$ <br />Subtotal for acquisition 237,000.00$ <br />Subtotal 849,404.00$ <br />5% contingency 42,470.20$ <br />Permits, Engineering and Design Fees 7%$59,458.28 <br />TOTAL 951,332.48$ <br />Jones Lake Cost EstimatePage 1
The URL can be used to link to this page
Your browser does not support the video tag.