My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-111
NewBrighton
>
Council
>
Resolutions
>
Resolutions 1998
>
98-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2005 10:14:48 AM
Creation date
7/14/2005 11:39:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Fee Register <br /> <br />DESCRIPTION <br />BUILDING FEES CON'T: <br />Mechanical <br />Mechanical permit issuance fee <br />Residential I & 2 family dwelling <br />Other <br />Commercial & Industrial <br /> <br />Base <br />Fee <br /> <br />Other <br /> <br />$15.00 <br /> <br />$100.00 <br />$20.00 <br />2% of contract price <br /> <br />Electrical <br />Fees shall be paid according to the following schedule: State surcharge of$.50 added to all permit fees. <br /> <br />(a) Minimum Fees: <br />I) Resdential - Minimum fee for each separate inspection of an installation, replacement, alteration, or repair <br />limited to one inspection only $20.00 <br />2) Non Residential - Minimum fee for each separate inspection of an installation, replacement, alteration, or repair <br />limited to one inspection only $25.00 <br />Minimum fee for installations requiring 2 inspections (rough-in & final) $50.00 <br /> <br />(b) Services, changes of services, temporary services, additions, alterations or repairs on either primary <br />secondary services shall be computed separately: <br />0- 100 ampere capacity <br />For each additional 100 ampere capacity or fraction thereof <br /> <br />$30.00 <br />$8.00 <br /> <br />(c) Circuits, installations of, additions, alterations, or repairs of each circuit or sub-feeder shall be <br />computed separately, including circuits fed from sub-feeders and including equipment served, except <br />as otherwise provided for in (J) through (8): <br />o to and including 200 ampere capacity <br />Each additional 100 ampere capacity of fraction thereof <br /> <br />$6.00 <br />$4.00 <br /> <br />(I) Maximum fee on a single family dwelling shall not exceed $85.00 ifnot over 200 ampere capacity. This <br />includes service, feeders, circuits, fIXtureS, and equipment. This maximum fee includes not more than three inspections. <br /> <br />(2) Maximum fee on an apartment building shall not exceed $35.00 per dwelling unit for the first 40 units <br />and $30.00 per dwelling unit for the balance of the units. The fee for the service and feeders in an apartment building <br />shall be in accordance with 2b and 2c of the schedule and shall be added to the fee for circuts in individual apartments. The <br />maximum fee for an apartment applies only to the circuits in the apartment. A two-family unit (duplex) maximum fee per <br />unit as per single family dwelling. <br /> <br />(3) Fees for feeders, and circuits operating over 250 volts shall be double these listed in item 2c. <br /> <br />(4) The fee for mobile homes shall be in accordance with 2b and 2c of this fee schedule. <br /> <br />(5) In addition to the above fees: <br />(a) A charge of $2 will be made for each lighting standard. <br />(b) A charge of $3 will be made for each traffic signal standard. Circuits originating within the standard will not <br />be used when computing the fee. <br /> <br />(6) In addition to the above fees, all transformers and generators for light, heat, and power shall be <br />computed separately at $5.00 per unit plus $3 per 10 kilovolt amperes or fraction thereof. <br /> <br />(7) In addition to the above fees, all transformers for signs and outline lighting shall be computed at $5.00 for each unit. <br /> <br />(8) In addition to the above fees (unless included in the maximum fee filed by the initial installer) remote <br />control, signal circuits and circuits less than 50 volts shall be computed at $6.00 for each 10 openings or devices of <br />each system plus $.50 fOf each additional opening. <br /> <br />(d) For review of plans and specifications of proposed insta1lations, there shall be a minimum fee of $1 00.00 <br />up to and including $30,000 of electrical estimate, plus 1110 of I % of any amount in excess of $30,000 <br />to be paid by persons or fmns requesting the review. <br /> <br />G:\BUDGE1\99\99FEEREG. WB2 <br /> <br />21-Dec-98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.