My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.08.18 PC Packet Combined
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2015
>
2015.08.18 PC Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:49:53 PM
Creation date
8/19/2015 1:51:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Variance Standards Worksheet <br />A variance cannot be approved unless the Planning Commission and City Council find <br />that the following standards have been met. Please provide a response as to how/why <br />your project will meet these criteria. Use additional sheets if necessary and consult with <br />the Planning Director at your Pre -Application Meeting if you need clarification on the <br />intent of any of the below standards. <br />1) Practical difficulties <br />A small studio is desired beyond the existing square feet. <br />2) Reasonable use <br />The studin will he iiseri by the nwner as a study, num iPt .Spsr.P, that Innks to the <br />pond. <br />3) Applying to property <br />The studio is situated to the back of the house and centered, away from the street and neighbors <br />as much as possible. <br />4) Character of the locality <br />5) Consistency with Comprehensive Plan <br />The studio is not inconsistent with the Comprehensive Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.