My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.12.02 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2015
>
2015.12.02 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2015 4:39:11 PM
Creation date
12/31/2015 4:38:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was fairly certain the site was clean but confirmation was needed as additional <br />environmental or geotechnical corrections could increase development costs. Staff just <br />received a draft report of this work last week, which indicates the site is environmentally <br />clean and geotechnically sound. There is some concrete debris from a former cell tower, <br />but removal shouldn’t impact overall development costs. <br /> <br />Streamworks has asked for Request for Proposals for four sites: 1) New Brighton <br />Exchange, 2) a Children’s Hospital site in Shoreview, 3) a CSM site in Blaine, and 4) a <br />Ryan-controlled site in Brooklyn Park. RFP’s are expected to be in by the end of the <br />year. If Streamworks still intends to be in a new building by the end of 2016, they’ll have <br />to make a decision very early in January/February. Attached is the most recent site plan <br />developed by Ryan Companies for Streamworks. Staff will report any and all future <br />progress to the EDC. <br /> <br />Attachments <br /> Methane Monitoring Point Map <br /> Draft Site Plan for Streamworks <br />
The URL can be used to link to this page
Your browser does not support the video tag.