Laserfiche WebLink
was fairly certain the site was clean but confirmation was needed as additional <br />environmental or geotechnical corrections could increase development costs. Staff just <br />received a draft report of this work last week, which indicates the site is environmentally <br />clean and geotechnically sound. There is some concrete debris from a former cell tower, <br />but removal shouldn’t impact overall development costs. <br /> <br />Streamworks has asked for Request for Proposals for four sites: 1) New Brighton <br />Exchange, 2) a Children’s Hospital site in Shoreview, 3) a CSM site in Blaine, and 4) a <br />Ryan-controlled site in Brooklyn Park. RFP’s are expected to be in by the end of the <br />year. If Streamworks still intends to be in a new building by the end of 2016, they’ll have <br />to make a decision very early in January/February. Attached is the most recent site plan <br />developed by Ryan Companies for Streamworks. Staff will report any and all future <br />progress to the EDC. <br /> <br />Attachments <br /> Methane Monitoring Point Map <br /> Draft Site Plan for Streamworks <br />