Laserfiche WebLink
New Brighton 2015 Fee Schedule <br />PUBLIC WORKS: <br />Description <br />2015 <br />Residential pool filling from hydrant - costs for water usage & service fee <br />$95 <br />Deposits required for: hydrant usage, fire hose, wrench <br />Hydrant meter usage - cost for service fee <br />$50 <br />Charges for: water usage at current rete and applicable saics tax <br />Deposits required for: hydrant meter, hydrant usage; adapter, tivrench <br />Flydrani meter deposit - $1,500 for 3 inch meter <br />$95 <br />Hydrant meter deposit - $1,025 for 2 inch meter <br />Hydrant meter deposit - $800 for 1 V2 inch meter <br />Hydrant meter deposit - $440 for 3/4 inch meter <br />$650 <br />Hydrant usage deposit - $425 <br />$80 <br />Hydrant hose adapter deposit - $75 <br />Hydrant wrench deposit - $50 <br />$30 <br />Water meters shall be based on the cost of the water meter, radio <br />$35 <br />transmitter, fittings, freight, and sales tax. <br />$30 <br />Meter Size: <br />3/4 " (residential) <br />$420 <br />Dump Truck and Driver (per Hour) - One Hour Minimum <br />$530 <br />1 12" <br />$850 <br />2' <br />$1,200 <br />3" (compound) <br />$3,700 <br />4" (compound) <br />$4,900 <br />City Sewer Connection Charge per MCES SAC <br />$185 <br />City Water Connection Charge per MCES SAC <br />$5545 <br />(Note: The connection charges cover the costs of core facilities <br />such as new wells, pump stations, lift stations, water treatment <br />facilities, and reservoirs. The charge includes inpsection permit <br />fees for these connections.) <br />Sewer or Water Connection Inspection for Repair <br />$95 <br />(Note: This is $75 for water & $75 for sewer, $15 admin & $5 State) <br />Street or Curb Cut: <br />Deposit <br />$650 <br />Permit <br />$80 <br />Courtesy benches within right-of-ways: <br />Initial inspection per bench <br />$30 <br />Initial permit per bench <br />$35 <br />Annual permit renewal per bench <br />$30 <br />Equipment Rental <br />Sweeper and Operator (per Hour) - One Hour Minimum <br />$125 <br />Dump Truck and Driver (per Hour) - One Hour Minimum <br />$125 <br />Other Equipment Rental refer to PW billable rate schedule <br />Engineering <br />Assessment Search <br />$40 <br />Right of Way: <br />Registration Fee <br />$50 <br />Excavation Permit Fee <br />$160 <br />Obstruction Permit Fee (not required with excavation permit) <br />$75 <br />Permit Extension <br />$50 <br />Delay Penalty (plus $25 permit extension fee) <br />$25 <br />