My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0841
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0801-
>
0841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 7:11:02 AM
Creation date
1/21/2016 7:09:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Brighton 2016 Fee Schedule <br />PUBLIC WORKS: <br />Description 2016 <br />Tracto0 Back Hoe/ Wheeled Escavator with hammer/ Front End <br />Loader/ Single Axle Dump Truck/ Tandem Axle Dumpt Truck/ <br />Sweeper / Road Grader <br />@ Regular time $150 <br />@ Over -time $175 <br />Pick up Trucks/ Asphalt Roller/ Bob Cat/ Tool Cat/ Mowers / Jetter / <br />Vactor <br />@ Regular time <br />$125 <br />@ Over -time <br />$150 <br />Generator / Light Tower <br />@ Regular time <br />$100 <br />@ Over -time <br />$125 <br />Pumps - Regular time <br />$50 <br />Pumps - Over -time <br />$75 <br />Other Equipment Rental will be as determined <br />Engineering <br />Official Assessment Search <br />$40 <br />Right of Way: <br />Registration Fee <br />$50 <br />Excavation Permit Fee <br />$160 <br />Obstruction Permit Fee (not required with excavation permit) <br />$75 <br />Permit Extension <br />$50 <br />Delay Penalty (plus $25 permit extension fee) <br />$25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.