My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0841
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0801-
>
0841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 7:11:02 AM
Creation date
1/21/2016 7:09:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Brighton 2016 Fee Register <br />(__JILDING: <br />Description 2016 <br />Moving over private property $31.00 <br />Moving over public streets <br />Larger than 12 R high, 14 feet wide, 25 Feet long $79.00 <br />No larger than 12 feet high, 14 feet wide, 25 Feet long $42.00 <br />Excavating / Grading Fees <br />50 cubic yards or less <br />51 to 100 cubic yards <br />101 to 1,000 cubic yards' <br />1,001 to 10,000 cubic yards <br />10,001 to 100,000 cubic yards <br />100,001 + cubic yards or more <br />Administrative Fee <br />• Over 100 Cubic Yards is required to pull a SWWPP Permit <br />Other Inspection Fees <br />Inspections outside of normal business hours <br />(Minimum charge - two hours) <br />Reinspection fees <br />Inspections for which no fee is specifically indicated <br />Additional plan review required by changes, <br />Additions or revisions to plans (Minimum <br />charge one hour) <br />Change of address. <br />Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages fringe benefits of the employee involved. <br />ter and Sewer Connection Fee <br />MCES Fee (per SAC) <br />City Sewer Maintenance Fee (per SAC) <br />Please see Public Works for additional Sewer Access and Water <br />Connection charges <br />Manufactured Homes <br />Manufactured Home Set -Up <br />Manufactured home Inspection Sell/Buy <br />Each Additional Width Set -Up <br />Administrative Fee <br />State Surcharge Fee <br />Electrical Fees <br />Fees shall be paid according to the following schedule: State surcharge of $5.00 added to all permit fees <br />Minimum Fees: <br />1) Minimum fee for each separate residential inspection of an installation, replacement, alteration, or repair <br />limited to <br />one inspection only. <br />2) Services, changes of services, temporary services, additions, alterations or repairs on either primary <br />secondary services shall be computed separately: <br />0 - 200 ampere capacity <br />For each additional 100 ampere capacity or fraction thereof <br />3) Circuits, installations of, additions, alterations, or repairs of each circuit or sub -feeder shall be <br />computed separately, including circuits fed from sub -feeders and including equipment served, except <br />as otherwise provided for in (1) through (8): <br />Reconnect Feeder and Circuits <br />0 to and including 200 ampere capacity <br />Each additional 100 ampere capacity of fraction thereof <br />4) Maximum fee on a single family dwelling shall not exceed $155.00 if not over 200 ampere capacity. This <br />includes service, feeders, circuits, fixtures, and equipment. This maximum fee includes not more than three <br />inspections. <br />5) Maximum fee on an apartment building shall not exceed $46.50 per dwelling unit for the first 20 units <br />and S36.00 per dwelling unit for the balance of the units. The fee for the service and feeders in an apartment <br />rilding shall be in accordance with 2b and 2c of the schedule and shall be added to the fee for circuits in <br />dividual apartments. The maximum fee for an apartment applies only to the circuits in the apartment. A <br />two-family unit (duplex) maximum fee per unit as per single family dwelling. <br />$44.50 <br />$51.50 <br />$50.00 for first 100 cubic yards, plus S 11.00 for each <br />additional 100 yards or fration thereof. <br />$175.00 for first 1000 cubic yards, plus $9.00 for each <br />additional 1000 yards or fration thereof. <br />$287.00 for first 1000 cubic yards, plus $42.00 for each <br />additional 10,000 yards or fration thereof. <br />$697.50 for first 100,000 cubic yards, plus $24.00 for each <br />additional 100,000 yards or fration thereof. <br />$15.00 <br />$95/Hr <br />$79/Hr <br />S79/Hr <br />$79/Hr <br />$42.00 <br />$2,485.00 <br />$103.00 <br />$79.00 <br />$131.50 <br />$16.00 <br />$15.00 <br />.0005% x valuation ofjob (minimum fee = $5.00) <br />$42.00 for each circuit and feeder. Maximum fee <br />not to exceed $160.00 <br />$42.00 <br />$8.00 <br />$3.00 <br />$8.00 <br />$5.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.