My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.02.10 WS Packet Combined (1 entry)
NewBrighton
>
Council
>
Packets
>
2015
>
2015.02.10 WS Packet Combined (1 entry)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 5:27:50 PM
Creation date
1/27/2016 1:19:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C - Flow -Chart of Communications Between Xcel Energy and a City <br />Requesting or Ordering Installation of Electric Distribution Facilities as a Special Facility <br />City <br />1) City contacts Xcel Energy regarding potential <br />electric distribution project. <br />3) City reviews project information, verifies or <br />changes project information and assumptions, <br />signs Scoping Estimate form and returns it to Xcel <br />Energy. <br />5) City decides to proceed with obtaining an <br />engineering estimate, notifies Xcel Energy. <br />7) If: (1) City decides to order Xcel Energy to install <br />special or standard facilities, or (2) if this is a distribution <br />undergrounding request and City chooses not to prepay <br />and allows Xcel Energy to recover excess expenditures <br />via the CRFS Rider, then see (8). <br />10) Within 60 days from receipt of surcharge notification <br />a City ordering installation of special facilities can <br />respond regarding its preferred payment option <br />provided by the tariff, or notify MPUC of the City's <br />objection to the imposition of the surcharge. <br />Xcel Energy <br />4) Xcel Energy develops scoping estimate of cost of the <br />project as requested or ordered by City and cost of project using <br />standard Installation, and preliminarily verifies whether the <br />project as requested by City is a "special facilities" project. <br />Xcel Energy completes and returns the "Scoping Estimate" form. <br />6) Xcel Energy completes and provides City a detailed <br />engineering -based cost estimate that provides: additional <br />detail on project using both standard and special facility <br />installations; excess expenditures; <br />amounts as per CRFS Rider tariff <br />8) Xcel Energy sends construction notification confirmation <br />letter and commences construction. <br />9) Xcel Energy completes construction and sends notice <br />of CRFS surcharge implementation. <br />11) If City does not respond or file an objection, CRFS rate <br />surcharge is implemented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.