Laserfiche WebLink
I � i <br />— <br />NEW <br />COMMUNITY <br />O <br />ENTER <br />I <br />RALPH REEDER � <br />MV SCHOOL 0 40 80 160 <br />HORIZONTAL <br />SCALE IN FEET <br />I R o <br />i1 <br />�,. <br />70� Sr NW ... <br />O c�C3_ <br />E GOLDEN POND u <br />/ APARTMENTS' <br />it <br />ST. JOHN'S SCHOOL <br />TRIVILA <br />NURSING HOME <br />0 <br />1 <br />z o J <br />nI <br />PHASING LEGEND CONSTRUCTION PHASING NOTES <br />PHASE 2 PHASE 1: <br />n PHASE 1 1. PHASE 1 SHALL BE SUBSTANTIALLY COMPLETE BY AUGUST 2, 2015. <br />9 <br />x PHASE 2. <br />1. PHASE 2 SHALL BE SUBSTANTIALLY COMPLETE BY BY AUGUST 2, 2015. <br />PHASE 3 2. SUBSTANTIAL COMPLETION OF PHASE 1 IS REQUIRED TO BE COMPLETE _ <br />PHASE 4 PRIOR TO BEGINNING PAVEMENT REMOVALS ON PHASE 2. VETERAN'S FIELD _ <br />n PHASE 3: D <br />MNDOT SP 6284-171 1. THE CONTRACTOR HAS 2 OPTIONS FOR COMPLETING PHASE 3 AS NOTED - 3 <br />0 IMPROVEMENTS (BY OTHERS) BELOW: ST. JOHN'S z <br />j I.I. PHASE 3 SHALL BE SUBSTANTIALLY COMPLETE BY AUGUST 2, 2015. - CHURCH _ <br />ACCESS NOTES 1.2. IF PHASE 3 CANNOT BE SUBSTANTIALLY COMPLETE BY AUGUST 2, CIN 0 0 0 0 <br />10 ACCESS TO BE MAINTAINED AT ALL TIMES. 2015, CONTRACTOR SHALL NOT BEGIN CONSTRUCTION ACTIVITIES ON HALL - <br />PHASE 3 UNTIL AFTER AUGUST 9, 2015. THE CONTRACTOR SHALL O I Ul <br />Q DRIVEWAY RECONSTRUCTION COMPLETED BY AUGUST 21, SUBSTANTIALLY COMPLETE PHASE 3 BY AUGUST 31, 2015. <br />2015. 2. SUBSTANTIAL COMPLETION OF PHASES 1 AND 2 IS REQUIRED PRIOR TO J - <br />BEGINNING PAVEMENT REMOVALS ON PHASE 3. <br />... - ...__„K. T <br />3 CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN - ......:...........:......... ...........:......................................:..:....................:..............................._._-_-_-.................................................................. .._ ..__-_........ ,. <br />O PHASE 4. <br />......................_.................................................. _,.............................................::::::.-:::::::::::::.-:::.............................-''::............................................................ BETHEL COLLEGE <br />ONE POINT OF ACCESS AT ALL TIMES. - _. ...-: ......._..............................................................................................................................................._....: <br />1. CONSTRUCTION OF PHASE 4 SHALL NOT BEGIN PRIOR TO AUGUST 9. 2015. <br />........................................................................................................................................ STUDENT HOUSING <br />ST N W::::: _ <br />s;::::::1::::::::::::::::z::;::::::;z:::r:;::::::_z:::z::::::::::::;::::::;::z:::_:::::::z:::::::::�:::z::;::::::;z:::r:;::::::_::::::::::::::::::;::: <br />2. PHASE 4 SHALL BE SUBSTANTIALLY COMPLETE BY SEPTEMBER 30, 2015.:........................_..................................................................................................................................................._.._........... <br />i <br />4 PEDESTRIAN ADA ROUTES SHALL BE MAINTAINED <br />3 THRoucHour CONSTRUCTION. SIGNAL PHASING NOTES -..._........................................................................ <br />= 1. SIGNAL WORK AT OLD HIGHWAY 8 INTERSECTION SHALL BE <br />a <br />rSUBSTANTIALLY COMPLETE PRIOR TO BEGINNING PHASE 4. (SIGNAL SHALL <br />M BE OPERATIONAL) - <br />zI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION <br />No. Date Revisions App. DRAWING NAME OR REPORT WAS PREPARED BY ME OR UNDER MY CITY OF NEW BRIGHTON S.A.P. 147-020-040, 062-619-033 SHEET N0. <br />X160539005-PHAS01.dwg DIRECT SUPERVISION AND THAT I AM A DULY COUNTY ROAD F/ 10TH STREET NW <br />LICENSED PROFESSIONAL ENGINEER UNDER THE !� cit 15 <br />i DESIGNED BY. LBM Ki ey>>> H <br />Q LAWS OF THE STATE OF MINNESOTA. ��* STREET REHABILITATION S.A.P. 147-020-041, 062-677-028 <br />DRAWN BY: BCS le ` BRGHrON CITY PROJECT 15-1 <br />CHECKED BY: EJF Rngt i q D°pmt—t <br />J 2550 UNIVERSITY AVENUE WEST, SUITE 238N, ST, PAUL, MN 55114 aos om xynueya S.A.P. 147-121-005 <br />PHONE: 651-645-4197 ++w �aWan W bbf 18 <br />DATE: 1 /15/2015 ERIC J. FOSMO, PE (abs) esa-lobo Q <br />PROJECT N0. 160539005 WWW.KIMLEY-HORN.CCM DATE: 1/15/2015 MN UC. N0. 48761 CONSTRUCTION PHASING PLAN C P 15-1 U <br />y <br />