Laserfiche WebLink
CHANGE <br />ORDER <br />"r1BSTITUTE <br />1 DOCUMENT G701-1987 <br />OWNER <br />[X ] <br />ARCHITECT <br />[X <br />CONTRACTOR <br />[X] <br />FIELD <br />[ ] <br />OTHER <br />[ ] <br />PROJECT: New Brighton Community Center CHANGE ORDER NUMBER: 1 <br />Restroom, Locker Room, and Family Area Remodel. <br />(name, address) 400 10th Street NW <br />New Brighton, MN 55112 DATE: November 26h, 2014 <br />TO CONTRACTOR: Rochon Corporation ARCHITECT'S PROJECT NO: 21325 <br />(name, address) 3650 Annapolis Lane N #101 <br />Plymouth MN 55447 CONTRACT DATE: August 27b, 2014 <br />CONTRACT FOR: General Construction <br />The Contract is changed as follows: <br />CR# <br />2R. Shower Light Fixtures. <br />$226.80 <br />3. Additional outlets. <br />$1,318.84 <br />4. Bathroom Cleanout. <br />$157.50 <br />6. Existing soffit insulation. <br />$297.15 <br />The new (Contract Sum) including this Change Order will be ....................................... <br />Total $2,000.29 <br />Not valid until signed by the Owner, Architect and Contractor. <br />original (Contract Sum) was.................................................$682,000.00 <br />vet change by previously authorized Change Orders .................................. <br />$0.00 <br />The (Contract Sum) prior to this Change Order was .................................. <br />$682,000.00 <br />The (Contract Sum) will be (increased) <br />by this Change Order in the amount of ................................... <br />$2,000.29 <br />The new (Contract Sum) including this Change Order will be ....................................... <br />$684,000.29 <br />The Contract Time will be (increased) by <br />( 0 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is: <br />NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by <br />Construction Change Directive. <br />Rosa Architectural Group <br />ARCHITECT <br />1084 Sterling Street N <br />St. Paul, MN 55119 <br />S <br />DATE: �-- <br />Rochon Corporation <br />CONTRACTOR <br />3650 Ann olis Lane N #101 <br />Plytnout <br />BY: ft -1-6 N <br />DATE: 1 <br />City of New Brighton <br />OWNER <br />803 Old Hwy 8 NW <br />New Brighton, MN 55112 <br />D <br />BY: <br />DATE: \ZLj i "I <br />