My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.07.28 Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.07.28 Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:43:28 PM
Creation date
2/1/2016 11:20:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF NEW BRIGHTON CONTRACTOR: Bituminous Roadways, Inc. <br />ENGINEERING DEPARTMENT 1520 Commerce Drive <br />Mendota Heights, MN 55120 <br />JULY 22, 2015 PHONE: (651) 686-7001 <br />FAX: (651) 687-9857 <br />CHANGE ORDER 2 <br />PROJECT 15-1, 2015 Street Rehabilitation <br />PURPOSE/DESCRIPTION: This change order includes the removal of existing storm sewer pipe and manholes and the reconstruction of this storm sewer line <br />to provide gravity flow from 8th Street NW to the storm sewer manhole adjacent to 9th Street and 2nd Avenue NW. During construction it was determined that <br />the existing storm sewer pipe network was installed with a sewer main running through the middle of one of our manholes. The project as bid, included removal <br />and replacement of the sanitary sewer pipes/mh's in this area. With the new pipe installed the proper clearance/separation from the sanitary and storm sewer <br />pipes cannot be met without the proposed revisions to the storm sewer network. This work was not anticipated at the time of the bid and would need to be paid <br />for by change order. <br />ACTION <br />THE FOLLOWING ESTIMATED QUANTITIES TO THE CONTRACT DOCUMENTS HAVE BEEN MODIFIED: <br />ESTIMATED <br />ITEM QUANTITY <br />ADD <br />STORM SEWER WORK <br />CONNECT TO EXISTING STORM MH <br />REMOVE STORM SEWER PIPE <br />REMOVE MH <br />8" HDPE DRAIN TILE WITH SOCK <br />COURSE FILTER AGGREGATE (DRAIN TILE BEDDING) <br />15" HDPE STORM SEWER <br />30" RCP CLASS 3 STORM SEWER <br />36" RCP CLASS 3 STORM SEWER <br />36" HDPE STORM SEWER <br />TEMPORARY CONNECTION <br />PIPE BEDDING MATERIAL <br />27" CATCH BASIN <br />72" DIAMETER CB/MH (0-7' BUILD) <br />RAIN GUARDIAN <br />SUBTOTAL OF ADDED ITEMS <br />TOTAL OF DEDUCTED ITEMS <br />TOTAL OF CHANGE ORDER 2 <br />UNIT UNIT EST. <br />PRICE QUANTITY TOTAL <br />EACH <br />$1,315.00 <br />2 <br />LF <br />$27.50 <br />450 <br />EACH <br />$1,315.00 <br />4 <br />LF <br />$26.40 <br />25 <br />TON <br />$52.80 <br />18 <br />LF <br />$54.45 <br />42 <br />LF <br />$161.70 <br />154 <br />LF <br />$185.90 <br />234 <br />LF <br />$105.60 <br />33 <br />EACH <br />$495.00 <br />1 <br />CY <br />$52.80 <br />100 <br />LF <br />$456.50 <br />6.0 <br />LF <br />$1,083.50 <br />14 <br />EACH <br />$1,980.00 <br />1 <br />ORIGINAL CONTRACT AMOUNT <br />PREVIOUS CHANGE ORDERS <br />CONTRACT PRICE PRIOR TO CHANGE ORDER <br />NET INCREASE OF CHANGE ORDER <br />NEW CONTRACT PRICE WITH CHANGE ORDERS <br />CHANGE IN CONTRACT TIME <br />APPROVED BY: DATE <br />CRAIG G. SCHLICHTING <br />DIRECTOR OF COMMUNITY ASSETS AND DEVELOPMENT <br />CITY OF NEW BRIGHTON <br />APPROVED BY: DATE <br />BITUMINOUS ROADWAYS INC. <br />APPROVED BY COUNCIL ACTION: JULY 28, 2015 <br />$2,630.00 <br />$12,375.00 <br />$5,260.00 <br />$660.00 <br />$950.40 <br />$2,286.90 <br />$24,901.80 <br />$43,500.60 <br />$3,484.80 <br />$495.00 <br />$5,280.00 <br />$2,739.00 <br />$15,169.00 <br />$1,980.00 <br />$121,712.50 <br />$0.00 <br />$121,712.50 <br />$3,544,743.61 <br />$58,164.50 <br />$3,602,908.11 <br />$121,712.50 <br />$3,724,620.61 <br />NONE <br />
The URL can be used to link to this page
Your browser does not support the video tag.