Laserfiche WebLink
KCIodow <br />k <br />_ �I i! <br />i <br />camulis Inc <br />KCI Project No.: 14MN139 Inspector: Brian Kollmer <br />Project Name: Water Storage Ice Evaluation Client: City of New Brighton <br />Date: 3/12/2014 Sheet 1 of 5 <br />SINGLE PEDESTAL TANK — 5T" STREET NW: <br />Tank is equipped with a "Solar Bee" mixing unit, which could be heard operating upon ascent of the tank's <br />interior. The entire interior tank surface and water are clear of any ice/freezing. <br />*See photographs on Page 2 <br />GROUND STORAGE TANK — 5T" STREET NW: <br />Tank is not equipped with a mixing unit. The entire interior tank surface and water are clear of any <br />ice/freezing. Was informed that the tank has had frequent cycling of water, in order to support the <br />surrounding city's demands. <br />*See photographs on Page 3 <br />441111:7>A:1004Ijr_1Z1:a 191IN*]9 ( <br />Tank is not equipped with a mixing unit. Entire water surface is iced over; Stress cracks and lifting in the ice; <br />Estimate of ice thickness 3-5 feet. <br />*See photographs on Page 4 <br />HYDRO PILLAR — 5T" STREET SW <br />Tank is not equipped with a mixing unit. Entire water surface is iced over; Stress cracks and lifting in the ice; <br />Estimate of ice thickness 4-6 feet. <br />*See photographs on Page 5 <br />Page 11 <br />