My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.10.13 CC Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.10.13 CC Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 8:27:16 PM
Creation date
2/1/2016 2:47:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KCI KorEn colvssrnuNn,, ma <br />7494253 d Avenue NE, <br />Stacy, MN 55079 <br />Phone: (651) 462-7266 <br />Fax: (651) 462-3249 <br />August 19, 2015 <br />Mr. Scott Boller <br />Public Works Superintended <br />7005 th Street NW <br />New Brighton, MN 55112 <br />Engineering, Coatings & Inspection Services <br />Re: Proposal to Install SolarBee Mixing Units <br />On the Interior of Three (3) Potable Storage Tanks <br />1.3 MMG GSR <br />1.0 MMG Hydropillar — South Tower <br />500 MG EWT — Forestdale Tower <br />Proposal: No. 15-05 <br />Dear Mr. Boller: <br />By: Email <br />Kollmer Consultants, Inc. (KCI) is pleased to submit this proposal to Install three (3) <br />Solar Bee Mixers on the above referenced water storage tanks for the City of New <br />Brighton, Minnesota. <br />SCOPE OF WORK <br />Install Solar Bee Mixing Units per the recommendation of the Manufacturer for Potable <br />Water Storage Tanks. <br />Forestdale Tower <br />1. Furnish and install a SolarBee GridBee GS -9-120v Submersible Mixer NSF <br />system in the reservoir as manufactured by SolarBee Inc. of Dickinson, ND. <br />2. The power cord from the exterior roof junction box shall be installed in rigid <br />conduit to the base of the tower, trenched underground to the control building, <br />connected to the control box and connected to the power control panel. <br />3. PVC conduit shall be schedule 80. <br />4. Exterior conduit shall be painted to match the tower. <br />5. Warranty. The circulation equipment shall be warranted to be free of defects in <br />materials and workmanship for two (2) years. <br />City shall connect to their SCADA System. <br />1.3 MMG Ground Storage Reservoir <br />1. Furnish and install a SolarBee GridBee GS -12-120v Submersible Mixer NSF <br />system in the reservoir as manufactured by SolarBee Inc. of Dickinson, ND. <br />2. The power cord from the exterior roof junction box shall be installed in rigid <br />conduit to the base of the tower, trenched underground to the control building, <br />connected to the control box and connected to the power control panel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.