My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.11.10 CC and WS Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.11.10 CC and WS Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 8:53:44 PM
Creation date
2/1/2016 3:27:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to Amendment Number 4, <br />dated October 27, 2015. <br />Kimley-Horn will complete the following additional services as part of the final design and <br />construction phase of County Road F/101h Street NW. <br />A. County Road F/101h Street NW <br />I dsN IUr1— oiyndi dusu ucnuun Leuei — vw n1c711wdy of 1U... aueel rvvv <br />The submittal of the signal system replacement plans to MnDOT State Aid required the <br />submittal of a signal justification letter. Kimley-Horn prepared the signal justification letter in <br />accordance with MnDOT and Ramsey County standards and coordinated review and <br />comments with the two agencies. The signal justification letter was necessary for the signal <br />work at Old Highway 8 and 10th Street NW. <br />Task 16A—SEQ and Bidding Document Coordination <br />Kimley-Horn performed additional work to coordinate and prepare the Statement of Estimated <br />Quantities (SEQ) and bid proposal form. Kimley-Horn coordinated and generated project bid <br />quantities for the street improvements designed by the City of New Brighton and included <br />them in the SEQ and bid proposal form. <br />Task 17A—Additional Construction Phase Services <br />As a part of the construction phase of the project City staff requested that Kimley-Horn <br />provide on-site observation services for the signal installation at the intersection of Old Hwy 8 <br />and 101h Street NW. Kimley-Horn also provided construction phase services for the Mounds <br />View High School Trail construction in the City of Arden Hills. <br />• Signal Inspection <br />Kimley-Horn provided a field representative for signal construction as requested by <br />City staff. We will provide up to 40 hours of on-site observation. <br />Arden Hills Mounds View High School Trail Construction <br />Based on direction from staff at the City of Arden Hills and New Brighton, Kimley- <br />Horn provided construction phase services for the Mounds View High School Trail <br />project. We have provided assistance in coordination with private utilities, answered <br />questions from the contractor, and provided on-site observation of wall construction <br />activities. The effort required for construction phase services for the Mounds View <br />High School Trail project was 10 hours. <br />Task 18A —Construction Phase Design Assistance <br />Kimley-Horn was asked by City staff to assist with a storm sewer/sanitary sewer design issue <br />between 81h Street NW and g1h Street NW. We discussed and developed a solution to <br />mitigate the sanitary sewer and storm sewer conflict including an exhibit that identified pipe <br />sizes, types, inverts, and grades. <br />
The URL can be used to link to this page
Your browser does not support the video tag.