My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.11.24 WS and CC Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.11.24 WS and CC Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 9:18:25 PM
Creation date
2/1/2016 4:10:21 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revision <br />Cut / Excavation (CY) <br />Common Excavation (CY) <br />68165 Excavation CUT volume (unadjusted) - per CAD Common Excavation volume surface (includestopsoil) <br />4480 removal of existing dam embankment materials to be replaced with clay core (east side of dam) <br />1070 overexcavation to place IESF materials <br />-1230 less bituminous trail holddown <br />-57154 less Dredge Material Excavation <br />15331 Subtotal - Cuts - Compacted Volume (Borrow Material Available for Construction not inclu ing Dredge Mgmt Level 1 Materials) <br />Dredge Materials (CY) <br />Compacted Loose (assuming 1.7 fill factor) <br />33017 46224 Dredge Mgmt Level 1 total available material for onsite use <br />12367 21024 Dredge Mgmt Level 2 to be relocated offsite <br />11770 20009 Dredge Mgmt Level 3 to be relocated offsite <br />57154 Subtotal - Cuts (Dredge Materials) - Compacted Volume per CAD Volume Surface <br />87257 Subtotal - Cuts (Dredge Materials) - Loose Volume <br />Fills (CY) from onsite sources - Required 'Vk" <br />Compacted Loose (assuming 1.4 fill factor) <br />24694 34572 Excavation FILL volume - per CAD Common Excavation volume surface (includes topsoil) <br />34572 Subtotal - Fills - Loose Volume Required <br />-15331 less available onsite borrow material <br />-19240 less available Dredge Mgmt Level 1 material consumed onsite <br />0 Soil Balance <br />26984 Dredge Mgmt Level 1 material to be relocated offsite <br />I hereby certify that this plan, specification, or report was prepared by me or <br />my direct supervision and that I am a duly Licensed Professional Engineer <br />the laws of the State of Minnesota. <br />Signature: <br />Date Ry Printed Ne <br />Date: <br />Houston <br />Engineering Inc. <br />Maple Grove <br />P: 763.493.45? <br />F: 763.493.55 <br />Drawn by <br />Date <br />DL <br />9-30-15 <br />Checked by <br />Scale <br />DDM <br />AS SHOWN <br />HANSEN PARK PROJECT <br />PRELIMINARY DESIGN PHASE <br />NEW BRIGHTON, MINNESOTA <br />VOLUMES <br />PROJECT NO. R145555-240 <br />SHEET <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.