My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.12.08 Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.12.08 Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 9:30:08 PM
Creation date
2/1/2016 4:32:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Brighton 2016 Fee Schedule <br />PUBLIC WORKS: <br />Description 2016 <br />Residential pool filling from hydrant - costs for water usage & service fee $110 <br />Deposits required for pool filling -hydrant usage, fire hose, wrench, backflow preventer <br />Hydrant meter usage - cost for service fee $50 <br />Charges for: water usage at current rate and applicable sales tax <br />Deposits required for: hydrant meter, hydrant usage, adapter, wrench, backflow preventer <br />Hydrant meter deposit - $3,135 for 3 inch meter <br />Hydrant meter deposit - $2,100 for 2 inch meter <br />Hydrant meter deposit - $2,000 for 1 1/2 inch meter <br />Hydrant meter deposit - $645 for 3/4 inch meter <br />Hydrant usage deposit - $1,000 <br />Hydrant hose adapter and backflow preventer deposit - $75 <br />Hydrant wrench deposit - $50 <br />Water meters shall be based on the cost of the water meter, radio <br />transmitter, fittings, freight, and sales tax. <br />$30 <br />Meter Size: <br />$35 <br />5/8" or 3/4 " (residential) <br />$420 <br />1" <br />$530 <br />1 1/2" <br />$920 <br />2" <br />$1,200 <br />3" (compound) <br />$4,035 <br />4" (compound) <br />$5,125 <br />Water meter no read fee (refundable if read received within 6 months) <br />$125 <br />Water connection turn on/off Fee <br />$40 <br />Utility workorder appointment no show fee <br />$20 <br />City Sewer Connection Charge per MCES SAC <br />$185 <br />City Water Connection Charge per MCES SAC <br />$545 <br />(Note: The connection charges cover the costs of core facilities <br />such as new wells, pump stations, lift stations, water treatment <br />facilities, and reservoirs. The charge includes inpsection permit <br />fees for these connections.) <br />Sewer or Water Connection Inspection for Repair <br />$95 <br />(Note: This is $75 for water & $75 for sewer, $15 admin & $5 State) <br />Street or Curb Cut: <br />Deposit <br />$650 <br />Permit <br />$80 <br />Courtesy benches within right-of-ways: <br />Initial inspection per bench <br />$30 <br />Initial permit per bench <br />$35 <br />Annual permit renewal per bench <br />$30 <br />Equipment Rental & Operator Rates: <br />Equipment Rental plus Operator Rates (all rates are per hour with one hour minimum) <br />Superintendents <br />$70.51 <br />Supervisors <br />$55.42 <br />Maintenance Worker - Regular time <br />$42.85 <br />Maintenance Worker - Over -time <br />$56.06 <br />Treatment Plant Operator - Regular time <br />$45.02 <br />Treatment Plant Operator - Over -time <br />$59.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.