My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016.04.06 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2016
>
2016.04.06 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:35:06 AM
Creation date
6/2/2016 3:05:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projects <br /> <br />Replace RTU’s and other potential energy saving equipment <br /> <br /> Engineering Verification <br /> <br /> Option #1 Replace RTU’s, DDC and Genesis Air Cleaners <br />•RTU’s and DDC will reduce energy consumption <br />•New RTU’s will require less repairs than current equipment <br />•Most cost effective replacement cost approach <br />•Adds greater control to facility environment <br /> <br /> Option #2 LED Lighting Retrofit <br /> <br /> Option #3 Building Envelop Repairs <br />
The URL can be used to link to this page
Your browser does not support the video tag.