My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016.06.28 WS
NewBrighton
>
Council
>
Packets
>
2016
>
2016.06.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 9:57:35 AM
Creation date
1/9/2017 9:41:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LETTER OF COMMITMENT (LOC) <br />The LOC would list Trane’s responsibilities as follows: <br /> <br />•Assist with the application process for the financing, <br />rebates, and any grants that may apply. <br />•Provide the estimated life-cycle energy savings <br />calculations (not guaranteed) <br />•Provide final construction proposal for accepted <br />projects to be entered as the contract. (Solar panel <br />layout and structural review will be required for this <br />project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.