Laserfiche WebLink
Trane’s responsibility detailed in the LOC would be to assist with the application <br />process for the financing, rebates, and any grants that may apply. Provide the <br />estimated life-cycle energy savings calculations (not guaranteed). Provide final <br />construction proposal for accepted projects to be entered as the contract. (Solar <br />panel layout and structural review will be required for this project). <br /> <br />With this information, staff recommends entering into an LOC with Trane.