My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016.06.28 WS
NewBrighton
>
Council
>
Packets
>
2016
>
2016.06.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 9:57:35 AM
Creation date
1/9/2017 9:41:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trane’s responsibility detailed in the LOC would be to assist with the application <br />process for the financing, rebates, and any grants that may apply. Provide the <br />estimated life-cycle energy savings calculations (not guaranteed). Provide final <br />construction proposal for accepted projects to be entered as the contract. (Solar <br />panel layout and structural review will be required for this project). <br /> <br />With this information, staff recommends entering into an LOC with Trane.
The URL can be used to link to this page
Your browser does not support the video tag.