My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016.05.17 Planning Commission Packet Combined
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2016
>
2016.05.17 Planning Commission Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2017 11:21:09 AM
Creation date
1/11/2017 10:33:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Larson Engineering, Inc. <br />3524 Labore Road <br />White Bear Lake, MN 55110-5126 <br />651.481.9120 Fax: 651.481.9201 <br />www.larsonengr.com <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />April 27, 2016 <br /> <br /> <br />City of New Brighton <br />803 Old Highway 8 NW <br />New Brighton, MN 55112 <br /> <br />Re: Land Use Application Narrative <br /> 2016 Press Box Replacement - Irondale High School <br /> New Brighton, MN <br /> <br /> <br /> <br />Mounds View Public Schools is proposing to replace their existing press box at Irondale High <br />School this year. Their existing press box is 8’ by 42’ in size and showing signs of age and <br />deterioration. It was determined to be more beneficial to replace the existing press box, instead of <br />repair the existing. As well as, the need for more space due to the additional media coverage, that <br />occurs now during the sporting events. The new press box is a pre-manufactured building and is <br />9’ by 54’ in size. The new press box will remain the same distance off the property line as the <br />existing press box. <br /> <br /> <br /> <br /> <br /> <br />Sincerely, <br />Larson Engineering, Inc. <br /> <br /> Eric Meyer, P.E. <br />Project Manager
The URL can be used to link to this page
Your browser does not support the video tag.