My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016.09.20 PC Packet Combined
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2016
>
2016.09.20 PC Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2017 11:21:09 AM
Creation date
1/11/2017 10:55:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />demand, locations as depicted on the plans, will not require additional Special Use Permit <br />approval. <br />3. The main walkway, parking spaces, and landscaping shall be installed with the three <br />initial cabinets. The additional paved surfaces and benches surrounding the future six <br />cabinets shall be installed at a future date with the additional cabinets. <br />4. The sculpture may be installed at a future date as donor and funding dictates. <br />5. The internal sign depicted on the Layout Plan, Sheet L1-2, cannot exceed 4 SF in graphic <br />area and shall be considered an internal directional sign. <br /> <br />Adopted this 20th day of September, 2016. <br /> <br /> <br /> <br /> <br /> <br /> <br />ATTEST: <br /> Erin Nichols Matkaiti, Planning Commission <br />Chair <br /> <br /> <br /> Janice Gundlach, Asst. Director of Community <br />Assets & Development/Planning Director
The URL can be used to link to this page
Your browser does not support the video tag.