Laserfiche WebLink
• Personnel services are under budget due to an accounting change to code actual time spent at the water <br />treatment plant directly to fund 206. <br />• In-house engineering and administrative charges are less than budgeted due to the shut-down of the water <br />treatment plant. <br />• Capital contributions include the value of Stormwater management assets paid for by the street improvements <br />fund for the 2015 street reconstruction projects and contribution of the infrastructure from the Exchange <br />development. <br />• Total capital outlay (not shown in table) was $897,814. The planned capital outlay of $100,000 for the Lake <br />Jones purchase was delayed until 2017. <br />• Ending cash balance is $909,070. <br /> <br />Street light system fund activity resulted in a $70,617 increase in net position, as compared to the planned decrease of <br />$162,900. This favorable result is a result of capital outlay expenses not shown as actual expenses in the fund. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• Customer charges increased from 2015 due to a 6% rate increase and were over budget in 2015 and 2016 as a <br />result of the development in the Exchange. <br />• Total capital outlay (not shown in table) was $99,321. Planned capital expenditures for re-lamping Silver Lake <br />Road were delayed until 2017 while the painting of the lights on Silver Lake Road and Old Highway 8 were <br />eliminated due to the new plan in 2017 to replace the poles. <br />• Ending cash balance is $20,916. <br />Street Light System Fund 2015 <br />Actual Budget Actual Variance Percent Dollars <br />Operating revenues: <br />Customer charges 246,640$ 247,200$ 249,896$ 2,696$ 1.3%3,256$ <br />Late charges - - 3,864 3,864 0.0%3,864 <br />Total operating revenues 246,640 247,200 253,760 6,560 2.9%7,120 <br />Operating expenses: <br />Materials and supplies - 2,400 157 2,243 0.0%157 <br />Contractual services 172,316 189,300 183,318 5,982 6.4%11,002 <br />Total operating expenses 172,316 191,700 183,475 8,225 6.5%11,159 <br />Operating income (loss)74,324 55,500 70,285 14,785 -5.4%(4,039) <br />Nonoperating activity <br />Interest on investments 52 600 480 (120) <br />Change in fair value of investments (20) - (148) (148) <br />Miscellaneous revenue 2,885 - - - <br />Capital outlay - (219,000) - 219,000 <br />Total nonoperating activity 2,917 (218,400) 332 218,732 <br />Change in net position 77,241 (162,900)$ 70,617 233,517$ <br />Beginning Net Position 4,393 81,634 <br />Ending Net Position 81,634$ 152,251$ <br />2016 Change from 2015