Laserfiche WebLink
Water utility fund activity resulted in a $853,934 increase in net position, which is considerably higher than the planned <br />increase of $184,800. This unplanned increase is a result of capital outlay expenses not shown as actual expenses in the <br />fund, budgeted interfund loan not needed, and unbudgeted depreciation expense and capital contributions. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• Customer charges were under budget as a result of roughly 47 million gallons billed less than anticipated due to <br />a summer watering ban, consistent rainfall, along with water conservation efforts of our customers. The <br />increase from 2015 is due to a 35% price increase along with 2016 actual gallons billed were roughly 42 million <br />gallons less than 2015. <br />• Personnel services are under budget due to an accounting change to code actual time spent at the water <br />treatment plant directly to fund 206. <br />• Contractual services are under budget as a result of energy cost savings from the shut-down of the City wells. <br />• Capital contributions include water improvements paid from the street improvements fund for the 2015, 2016 <br />street reconstruction projects along with developer contributions from the Exchange. <br />• Total capital outlay (not shown in table) was $211,576 which included work done for Lions park, the 2015 and <br />2016 street reconstruction projects. Delayed capital outlay projects included $373,400 for commercial water <br />Water Utility Fund 2015 <br />Actual Budget Actual Variance Percent Dollars <br />Operating revenues: <br />Customer charges 1,481,426$ 2,012,000$ 1,888,488$ (123,512)$ 27.5%407,062$ <br />Late charges 34,508 27,000 28,295 1,295 -18.0%(6,213) <br />Other charges 34,127 30,000 25,965 (4,035) -23.9%(8,162) <br />Total operating revenue 1,550,061 2,069,000 1,942,748 (126,252) 25.3%392,687 <br />Operating expenses: <br />Personnel services 615,315 605,700 573,312 32,388 -6.8%(42,003) <br />Materials and supplies 173,486 125,500 122,042 3,458 -29.7%(51,444) <br />Contractual services 873,563 959,000 875,039 83,961 0.2%1,476 <br />Depreciation 214,419 - 221,084 (221,084) 3.1%6,665 <br />Total operating expenses 1,876,783 1,690,200 1,791,477 (101,277) -4.5%(85,306) <br />Operating income (loss)(326,722) 378,800 151,271 (227,529) -146.3%477,993 <br />Nonoperating activity <br />Interest on investments 2,248 2,800 3,488 688 <br />Change in fair value of investments (612) - (946) (946) <br />In-house engineering and Admin <br />charges 221,190 200,900 108,031 (92,869) <br />Intergovernmental - - 38,097 38,097 <br />Miscellaneous Revenue 7,295 25,000 - (25,000) <br />Capital contributions 230,956 - 644,726 644,726 <br />Capital outlay - (1,222,700) - 1,222,700 <br />Transfer in 6,588 800,000 - (800,000) <br />Transfer out (530,087) - (90,733) (90,733) <br />Total nonoperating activity (62,422) (194,000) 702,663 896,663 <br />Change in net position (389,144) 184,800$ 853,934 669,134$ <br />Beginning net position 6,619,492 6,230,348 <br />Ending net position 6,230,348$ 7,084,282$ <br />2016 Change from 2015